Tampines Expressway
Tampines Expressway | |
---|---|
Lebuhraya Tampines (Malay) 淡滨尼高速公路 (Chinese) தெம்பினீஸ் விரைவுச்சாலை (Tamil) | |
Route information | |
Length | 14 km (8.7 mi) |
History | First section completed in June 1989, last section completed in August 1996 |
Major junctions | |
West end | Seletar (CTE, SLE) |
CTE, SLE, KPE, PIE | |
East end | Changi (PIE) |
Location | |
Country | Singapore |
Regions | Seletar, Sengkang, Punggol, Hougang, Pasir Ris, Tampines, Changi |
Highway system | |
The Tampines Expressway (TPE) is a highway in the north-eastern fringe of Singapore, joining the Pan Island Expressway (PIE) near Singapore Changi Airport in the east with the Central Expressway (CTE) and Seletar Expressway (SLE) in the north of the island.
History
[edit]The expressway was constructed alongside the development of Tampines New Town in the 1980s.[1] On 22 February 1986, tenders were called for the first section of the expressway. Work began on 5 August 1986 to widen the existing portions of Tampines Road. The first section of the expressway, stretching from the PIE to Elias Road, opened on 30 September 1987.[2]
On 19 November 1987, the contracts for the second phase of the expressway were awarded to Sembawang Construction and Hock Lian Seng Engineering. Phase 2 of the expressway, stretching westward from Elias Road to Lorong Halus, began construction on 24 December 1987 and opened on 30 May 1989.[3]
In the 1990s, extensions towards the west were made to connect the TPE with the CTE and SLE to serve the newer residential areas of Sengkang and Punggol and provide a continuous expressway link between the northern and eastern parts of the island. These extensions acquired much of Lorong Lumut, Lorong Halus Village, Cheng Lim Farmway, Jalan Kayu Village, Lorong Andong, Lorong Anchak and Boh Sua Tian Road. On 30 August 1992, the Public Works Department began construction of Punggol Flyover. On 13 April 1993, a local firm was awarded the tender to extend the TPE to Seletar. On 30 June 1994, the Public Works Department awarded a $38.9 million contract to Koh Brothers Building and Civil Engineering Contractor Pte Ltd for the construction of the Lorong Halus road interchange. The expressway was completed in August 1996 after the Lorong Halus interchange was completed.[4]
In 1998, two new viaducts and a loop connecting the TPE and PIE were constructed to reduce travelling times between Pasir Ris, Tampines and Changi Airport.[1]
On 19 Feb 2023, Tampines Viaduct was opened to the public.[5] This newly constructed one-way viaduct allows motorists traveling eastbound along TPE to directly access the PIE traveling towards Tuas in the westbound direction using the newly opened Exit 2A.[6] The viaduct was initially scheduled to open in early 2020, but fatal collapse occurred during construction of the viaduct in 2017, which resulted in one dead and 10 injured.[7] Following the incident, the Land Transport Authority (LTA) announced that the project would be completed by another company instead, which resulted in the viaduct eventually completed after a three-year delay.
On 22 Jan 2024, the Seletar Link Flyover was opened to the public.[8] The flyover provides an alternative route to/from Seletar Link, which previously only provided westbound access via Exit 11.[9] The development of the flyover is intended to support the expected future growth in neighbouring Punggol Town and Pulau Punggol Timor (an artificial island located north of Seletar), as well as Sengkang Town via planned road Sengkang West Drive in the future.
List of interchanges and exits
[edit]Location[10] | km[11][12] [13] | mi | Flyover[14] | Exit[14] | Destinations[14] | Notes |
---|---|---|---|---|---|---|
Tampines | 0.0 | 0.0 | Upper Changi | — | PIE (towards Changi) | Eastern terminus; expressway continues as Pan Island Expressway (PIE) |
0.2 | 0.12 | Upper Changi | 1A | Changi North Crescent, Changi North Industrial Park | Eastbound exit only | |
1.1 | 0.68 | 1 | PIE, Upper Changi Road North, Upper Changi Road East, Bedok Town | Eastbound exit and westbound entrance only | ||
1.3 | 0.81 | Loyang | 2 | Loyang Avenue, Pasir Ris Town, Changi Village, Tampines Avenue 7 | ||
1.9 | 1.2 | Tampines Viaduct | 2A | PIE (towards Tuas), Upper Changi Road East, Bedok Town | Eastbound exit only; exit was opened on 19 Feb 2023[6] | |
2.7 | 1.7 | Sungei Tampines | ||||
3.3 | 2.1 | Pasir Ris | 3A | Tampines Avenue 12 | Signed as exits 3A, 3B (westbound) and 3C (eastbound) | |
3.5 | 2.2 | 3B | Pasir Ris Drive 1, Pasir Ris Drive 8, Elias Road | |||
3.9 | 2.4 | 3C | Pasir Ris Drive 1, Pasir Ris Drive 8, Tampines Avenue 12 | |||
4.2 | 2.6 | — | 4 | Tampines Link (westbound) Elias Road (eastbound) | ||
4.9 | 3.0 | Api Api | 5 | Pasir Ris Drive 12, Tampines Avenue 10 | ||
6.7 | 4.2 | Tampines | 6 | KPE (towards ECP) Halus Link, Lorong Halus, Punggol Central | Signed as exits 6 (westbound) and exits 7, 7A (eastbound) | |
Sengkang | 7.5 | 4.7 | 7A | KPE, Tampines Road | ||
7.6 | 4.7 | Halus Bridge (Serangoon River) | ||||
7.9 | 4.9 | 7 | Halus Link, Lorong Halus, Punggol Central | |||
9.1 | 5.7 | Punggol | 9 | Punggol Road | ||
9.5 | 5.9 | Punggol West | 10 | Sengkang East Road, Punggol Way | ||
11.3 | 7.0 | Punggol Bridge (Sungei Punggol) | ||||
11.6 | 7.2 | Seletar Link | 11 | Seletar Link | Will also provide access to planned road Sengkang West Drive in the future | |
12.6 | 7.8 | Jalan Kayu | 12 | Jalan Kayu, Seletar Aerospace Way, Sengkang West Road | ||
13.2 | 8.2 | Seletar Aerospace | 13 | CTE (towards City), Yio Chu Kang Road | Westbound exit and eastbound entrance only | |
14.7 | 9.1 | Seletar | 14 | Seletar West Link, Yishun Avenue 1 | Westbound exit and eastbound entrance only | |
Seletar | 15.8 | 9.8 | — | — | SLE | Western terminus; expressway continues onto Seletar Expressway (SLE) |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
References
[edit]- ^ a b "TAMPINES EXPRESSWAY (TPE)". Land Transport Authority. Retrieved 11 June 2017.
- ^ "Part of Tampines Expressway opens". The Straits Times. 30 September 1987.
- ^ "Tampines expressway". The Business Times. 30 May 1989.
- ^ SPEECH BY MINISTER FOR COMMUNICATIONS MR MAH BOW TAN AT THE OPENING OF TAMPINES EXPRESSWAY (PHASE III) ON 3 SEPTEMBER 1996 AT 9.00 AM AT PUNGGOL BRIDGE
- ^ "Tampines Viaduct to open on Feb 19 after 3-year delay". CNA. Retrieved 2023-12-17.
- ^ a b "Tampines Viaduct to Open on 19 Feb" (Press release). Land Transport Authority. 2023-02-03. Retrieved 2023-12-17.
- ^ "Fatal PIE viaduct collapse: Or Kim Peow Contractors, project director and engineer found guilty". CNA. Retrieved 2023-12-17.
- ^ "Opening of New Flyover Connects Seletar Link to Tampines Expressway (TPE)" (Press release). Land Transport Authority. 2024-01-08. Retrieved 2024-02-19.
- ^ "New road connection to Seletar Link". lta.gov.sg. Land Transport Authority. Retrieved 1 January 2022.
- ^ "Master Plan". Urban Redevelopment Authority. Retrieved 2023-12-15.
- ^ "TPE to Exit 5" (Map). Google Maps. Retrieved 2023-12-17.
- ^ "TPE to Exit 13" (Map). Google Maps. Retrieved 2023-12-17.
- ^ "TPE to SLE" (Map). Google Maps. Retrieved 2023-12-17.
- ^ a b c "OneMap" (Map). OneMap. Singapore: Singapore Land Authority. Retrieved 12 May 2021.
External links
[edit]- Media related to Tampines Expressway at Wikimedia Commons
- Traffic camera monitoring the TPE