Jump to content

PATH (rail system)

Route map:
This is a good article. Click here for more information.
From Wikipedia, the free encyclopedia
(Redirected from List of PATH stations)

PATH
A PATH train of PA5 cars on the Newark–World Trade Center line, crossing the Passaic River en route to the World Trade Center
A PATH train of PA5 cars on the Newark–World Trade Center line, crossing the Passaic River en route to the World Trade Center
Overview
OwnerPort Authority of New York and New Jersey
LocaleNewark/Hudson County, New Jersey and Manhattan, New York
Transit typeCommuter railroad (de jure)
Rapid transit (de facto)
Number of lines4
Number of stations13
Daily ridership185,600 (weekdays, Q2 2024)[1]
Annual ridership55,109,100 (2023)[2]
HeadquartersPATH Plaza
Jersey City, New Jersey
Websitepanynj.gov/path
Operation
Began operationFebruary 25, 1908 (as H&M Railroad)
September 1, 1962 (as PATH)
Operator(s)Port Authority Trans-Hudson Corporation
Number of vehicles350 PA5 cars[3]
Technical
System length13.8 mi (22.2 km)
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
ElectrificationThird rail600 V DC

The Port Authority Trans-Hudson (PATH) is a 13.8-mile (22.2 km) rapid transit system in the northeastern New Jersey cities of Newark, Harrison, Jersey City, and Hoboken, as well as Lower and Midtown Manhattan in New York City. It is operated as a wholly owned subsidiary of the Port Authority of New York and New Jersey. PATH trains run around the clock year-round; four routes serving 13 stations operate during the daytime on weekdays, while two routes operate during weekends, late nights, and holidays. It crosses the Hudson River through cast iron tunnels that rest on a bed of silt on the river bottom. It operates as a deep-level subway in Manhattan and the Jersey City/Hoboken riverfront; from Grove Street in Jersey City to Newark, trains run in open cuts, at grade level, and on elevated track. In 2023, the system saw 55,109,100 rides, or about 185,600 per weekday in the second quarter of 2024, making it the fifth-busiest rapid transit system in the United States.

The routes of the PATH system were originally operated by the Hudson & Manhattan Railroad (H&M), built to link New Jersey's Hudson Waterfront with New York City. The system began operations in 1908 and was fully completed in 1911. Three stations have since closed; two others were relocated after a re-alignment of the western terminus. From the 1920s, the rise of automobile travel and the concurrent construction of bridges and tunnels across the river sent the H&M into a financial decline during the Great Depression, from which it never recovered, and it was forced into bankruptcy in 1954. As part of the deal that cleared the way for the construction of the original World Trade Center, the Port Authority bought the H&M out of receivership in 1962 and renamed it PATH. In the 2000s and 2010s, the system suffered longstanding interruptions from disasters that affected the New York metropolitan area, most notably the September 11 attacks and Hurricane Sandy. Both private and public stakeholders have proposed expanding PATH service in New Jersey, and an extension to Newark Liberty International Airport may be constructed in the 2020s.

Although PATH has long operated as a rapid transit system, it is legally a commuter railroad under the jurisdiction of the Federal Railroad Administration (FRA). Its right-of-way between Jersey City and Newark is located in close proximity to Conrail, NJ Transit, and Amtrak trackage, and it shares the Dock Bridge with intercity and commuter trains. All PATH train operators must therefore be licensed railroad engineers, and extra inspections are required. As of 2023, PATH uses one class of rolling stock, the PA5.

History

[edit]

Hudson & Manhattan Railroad

[edit]

The PATH system pre-dates the New York City Subway's first underground line, operated by the Interborough Rapid Transit Company. The Hudson & Manhattan Railroad (H&M) was planned in 1874, but it was not possible at that time to safely tunnel under the Hudson River. Construction began on the existing tunnels in 1890, but soon stopped when funding ran out. It resumed in 1900 under the direction of William Gibbs McAdoo, an ambitious young lawyer who had moved to New York from Chattanooga, Tennessee, and later became president of the H&M.[4] The railroad became so closely associated with McAdoo that, in its early years, its lines were called the McAdoo Tubes or McAdoo Tunnels.[5][6]

Construction

[edit]
One of the original plans, with branches to the Central Railroad of New Jersey Terminal (lower left) and the IRT Lexington Avenue Line at Astor Place (center)

Construction started on the first tunnel, now called the Uptown Hudson Tubes, in 1873.[7]: 14  Chief engineer Dewitt Haskin built the tunnel by using compressed air to open a space in the mud and then lining it with brick.[4] The railroad got 1,200 feet (366 m) from Jersey City this way[8]: 12  until a lawsuit stopped work;[9] accidents, including a particularly serious one in 1880 that killed 20 workers, caused additional delays.[10] The project was abandoned in 1883 due to a lack of funds.[4][7]: 67 [8]: 12  An effort by a British company, between 1888 and 1892, also failed.[11]

Hudson tunnels shortly after their completion

When the New York and New Jersey Railroad Company resumed construction on the uptown tubes in 1902, its chief engineer, Charles M. Jacobs, used a different method. He had workers push a tunnelling shield through the mud and then place tubular cast iron plating around the tube.[4] The northern tube of the uptown tunnel was completed this way shortly after work resumed[12] and the southern tube was built the same way.[4][13] The uptown tubes were completed in 1906.[14]

By the end of 1904, the New York City Board of Rapid Transit Commissioners had given the company permission to build a new subway line through Midtown Manhattan to connect with the Uptown Hudson Tubes, along with 26 years of exclusive rights to the line. The Midtown Manhattan line would travel eastward under Christopher Street before turning northeastward under Sixth Avenue, then continue underneath Sixth Avenue to a terminus at 33rd Street.[15]

In January 1905, the Hudson Companies, with $21 million in capital, were incorporated to complete the Uptown Hudson Tubes and build the Sixth Avenue line, as well as construct a second pair of tunnels, the current Downtown Hudson Tubes.[16][17] The H&M was incorporated in December 1906 to operate a passenger railroad system between New York and New Jersey via the Uptown and Downtown Tubes.[18][19]

The current Downtown Hudson Tubes were built about 1+14 miles (2.0 km) south of the first one. Three years of construction using the tubular cast iron method finished in 1909.[4][8]: 18  The uptown and downtown tunnels had two tubes, each with a single unidirectional track.[20] The eastern sections of the tunnels, in Manhattan, were built with the cut and cover method.[21]

Opening

[edit]
Park Place Station in Newark was the H&MRR's terminus until the completion of Newark Penn Station in the late 1930s.

Test runs of empty trains started in late 1907.[22] Revenue service started between Hoboken Terminal and 19th Street at midnight on February 26, 1908, when President Theodore Roosevelt pressed a button at the White House that turned on the electric lines in the uptown tubes (the first train carrying passengers, all selected officials, had run the previous day).[23][8]: 21  This became part of the current Hoboken–33rd Street line.[24]: 2  The H&M system was powered by a 650-volt direct current third rail which, in turn, drew power from an 11,000-volt transmission system with three substations. The substations were the Jersey City Powerhouse, as well as two smaller substations at the Christopher Street and Hudson Terminal stations.[25]

An extension of the H&M from 19th Street to 23rd Street opened in June 1908.[26] In July 1909, service began between the Hudson Terminal in Lower Manhattan and Exchange Place in Jersey City, through the downtown tubes.[27] The connection between Exchange Place and the junction near Hoboken Terminal opened two weeks later,[28] forming the basic route for the Hoboken-Hudson Terminal (now Hoboken–World Trade Center) line.[29]: 3  A new line running between 23rd Street and Hudson Terminal was created in September.[29]: 3  Almost a year after that, the H&M was extended from Exchange Place west to Grove Street,[30] and the 23rd Street–Hudson Terminal line was rerouted to Grove Street, becoming part of the current Journal Square–33rd Street line. A fourth line, Grove Street–Hudson Terminal (now the Newark–World Trade Center line), was also created.[29]: 3  In November 1910, the Hoboken–23rd Street and Grove Street–23rd Street lines were extended from 23rd Street to 33rd Street.[31][32]

The Grove Street–Hudson Terminal line was extended west from Grove Street to Manhattan Transfer in October 1911,[33] and then to Park Place in Newark on November 26 of that year.[34] After completion of the uptown Manhattan extension to 33rd Street and the westward extension to the now-defunct Manhattan Transfer and Park Place Newark terminus in 1911, the H&M was complete.[24]: 7  The final cost was estimated at $55–$60 million.[35][36] A stop at Summit Avenue (now Journal Square), located between Grove Street and Manhattan Transfer, opened in April 1912 as an infill station on the Newark-Hudson Terminal line, though only one platform was in use at the time. The station was completed by February 1913, allowing service from 33rd Street to terminate there.[24][29]: 7  The last station, at Harrison, opened a month later.[24]

External relations and unbuilt expansions

[edit]
Map
Map of unbuilt PATH (purple) and H&M (red) expansions. Former routing to Park Place is shown in yellow, and existing lines are shown in black. (Edit map)

Originally, the Hudson Tubes were designed to link three major railroad terminals on the Hudson River in New Jersey—the Erie Railroad (Erie) and Pennsylvania Railroad (PRR) in Jersey City and the Delaware, Lackawanna and Western Railroad (DL&W) in Hoboken—with New York City. While PATH still connects to train stations in Hoboken and Newark, the Erie's Pavonia Terminal at what is now Newport and the PRR terminal at Exchange Place station have been closed and demolished. There were early negotiations for New York Penn Station to also be shared by the two railroads.[37] In 1908, McAdoo proposed to build a branch of the H&M southward to the Central Railroad of New Jersey Terminal at Communipaw.[38]

When the rapid transit commissioners approved construction of the H&M's Sixth Avenue line in 1904, they left open the option of digging an east-west crosstown line. The New York and New Jersey Railroad Company received perpetual rights to dig under Christopher and Ninth Streets eastward to either Second Avenue or Astor Place.[15][8]: 22  The project was started but soon abandoned; about 250 feet (76 m) of the tube that was dug still exists.[8]: 22 [4]

In February 1909 the H&M announced plans to extend its Uptown Tubes northeast to Grand Central Terminal, located at Park Avenue and 42nd Street.[39] The openings of the 28th and 33rd Street stations were delayed because of planning for the Grand Central extension.[40] The New York Times speculated that the downtown tunnels would see more passenger use than the uptown tunnels because they better served the city's financial district.[39]

The Interborough Rapid Transit Company (IRT), a competitor to the H&M, proposed to connect its Lexington Avenue line to the H&M at Grand Central, Astor Place, and Fulton Street–Hudson Terminal once the planned system was complete.[39] Its terminus at Grand Central was supposed to be located directly below the IRT's 42nd Street line but above the IRT's Steinway Tunnel to Queens. However, the IRT constructed an unauthorized ventilation shaft between its two levels in an effort to force the H&M to build its station very deeply, making it less accessible.[41] As an alternative, it was proposed to connect the Uptown Tubes to the Steinway Tunnel.[42] A franchise to extend the Uptown Tubes to Grand Central was awarded in June 1909.[43]

By 1914, the H&M had not yet started construction of the Grand Central extension, and requested a delay.[44][8]: 55  Six years later, the H&M had submitted 17 applications for delays; in all of them, the railroad said it was not the best time for construction.[45] The Rapid Transit Commissioners declined the last one, effectively ending the H&M's rights to a Grand Central extension.[8]: 55–56 

Historic tile work at current 14th street PATH station

In September 1910, McAdoo proposed another expansion, consisting of a second north-south line through midtown. It would run 4 miles (6.4 km) from Hudson Terminal to 33rd Street and Sixth Avenue, underneath Herald Square and near the H&M's existing 33rd Street station. The new line would run mainly under Broadway, with a small section of the line in the south under Church Street. Under McAdoo's plan, the city could take ownership of this line within 25 years of completion.[31]

That November, McAdoo also proposed that the two-track Broadway line be tied into the IRT's original subway line in Lower Manhattan. The Broadway line, going southbound, would merge with the local tracks of the IRT's Lexington Avenue line in the southbound direction at 10th Street. A spur off the Lexington Avenue line in Lower Manhattan, in the back of Trinity Church, would split eastward under Wall Street, cross the East River to Brooklyn, then head down Fourth Avenue in Brooklyn, with another spur underneath Lafayette Avenue. McAdoo wanted not only to operate what was then called the "Triborough System", but also the chance to bid on the Fourth Avenue line in the future.[46] The franchise for the Broadway line was ultimately awarded to the Brooklyn Rapid Transit Company (BRT) in 1913, as part of the Dual Contracts.[47][48]

In 1909, McAdoo considered extending the H&M in New Jersey, building a branch north to Montclair, in Essex County. A route extending north from Newark would continue straight to East Orange. From there, branches would split to South Orange in the south and Montclair in the north.[49]

Decline and bankruptcy

[edit]

A record 113 million people rode the H&M in 1927.[8]: 55  Ridership declined after the opening of the Holland Tunnel late that year and fell further once the Great Depression began.[8]: 55 [50] The opening of the George Washington Bridge in 1931 and the Lincoln Tunnel in 1937 drew more riders out of trains and into their cars.[8]: 56 [51] The Summit Avenue station was renovated and rededicated as "Journal Square" in 1929; the railroad's powerhouse in Jersey City shut down later that year, as its system could now draw energy from the greater power grid.[24]: 7 

In the 1930s, service to the Uptown Hudson Tubes in Manhattan was affected by the construction of the Independent Subway System (IND)'s Sixth Avenue Line. The 33rd Street terminal closed in late 1937; service on the H&M was cut back to 28th Street to allow for subway construction.[52] The 33rd Street terminal was moved south to 32nd Street and reopened in 1939. The city had to pay the railroad $800,000 to build the new 33rd Street station; it reimbursed H&M an additional $300,000 for lost revenue.[53] The 28th Street station was closed at this time as unnecessary since the southern entrances to the 33rd Street terminal were only two blocks away; it was later demolished to make room for the IND tracks below.[54]

The 19th Street station, abandoned since 1954

The Manhattan Transfer station was closed in mid-1937, and the H&M realigned to Newark Penn Station from the Park Place terminus a quarter-mile (400 m) north; the Harrison station across the Passaic River was moved several blocks south as a result. The upper level of the Centre Street Bridge to Park Place later became Route 158.[55]

Promotions and other advertising failed to stem the financial decline of the H&M. The 19th Street station in Manhattan was closed in 1954.[56] That year, the H&M entered receivership due to its constant losses.[57] It operated under bankruptcy protection; in 1956 the two states agreed to settle its unpaid back taxes for $1.9 million.[58] That year, the H&M saw 37 million annual passengers, and transportation experts called for subsidies. One expert proposed a "rail loop", with the Uptown Hudson Tubes connecting to the IND Sixth Avenue Line, then continuing up Sixth Avenue and west via a new tunnel to Weehawken, New Jersey.[59] By 1958, ridership had dropped to 30.46 million annual passengers.[51] Two years later, creditors approved a reorganization plan.[60] During this time, H&M workers went on strike twice over wages: for two days in 1953,[61] and for a month in 1957.[62]

Port Authority takeover

[edit]
PATH train at Newark Penn Station, 1966

In the early 1960s, planning for the World Trade Center resulted in a compromise between the Port Authority and the state governments of New York and New Jersey. The Port Authority agreed to purchase and maintain the Tubes in return for the rights to build the World Trade Center on the footprint of H&M's Hudson Terminal, which was the Lower Manhattan terminus of the Tubes.[63] A formal agreement was made in January 1962;[64] four months later, the Port Authority set up two wholly owned subsidiaries: the Port Authority Trans-Hudson Corporation (PATH) to operate the H&M lines, as well as another subsidiary to operate the World Trade Center. All of the Port Authority's operations would have been subjected to federal Interstate Commerce Commission rules if it ran the trains directly, but with the creation of the PATH Corporation, only the subsidiary's operations would be federally regulated.[65]

In September, the Port Authority formally took over the H&M Railroad and the Tubes, rebranding the system as Port Authority Trans-Hudson (PATH).[8]: 58 [66] Upon taking over the H&M, the PANYNJ spent $70 million to modernize the system's infrastructure.[67] The PANYNJ also repainted H&M stations into the new PATH livery.[68] In 1964, the authority ordered 162 PA1 railway cars to replace the H&M rolling stock, much of which dated to 1909.[69] The first PA1 cars were delivered in 1965.[70] Subsequently, the agency ordered 44 PA2 cars in 1967 and 46 PA3 cars in 1972.[71]

Late 20th century

[edit]

1970s

[edit]

As part of the World Trade Center's construction, the Port Authority decided to demolish Hudson Terminal and construct a new World Trade Center Terminal.[64] Groundbreaking took place in 1966.[72] During excavation and construction, the original Downtown Hudson Tubes remained in service as elevated tunnels.[73] The new terminal, west of the Hudson Terminal, opened in 1971.[74] It cost $35 million to build, and saw 85,000 daily passengers at the time of its opening.[75] Hudson Terminal was then shut down.[73]

The Journal Square Transportation Center opened in 1973, consolidating operations in the 10-story building that is part of the complex.[76]

PATH arriving at Harrison, NJ in 1969

In January 1973, the Port Authority released plans to double the route mileage of the PATH system[71] with an extension from Newark Penn Station to Plainfield, New Jersey. A stop at Elizabeth would allow PATH to serve Newark Airport, where passengers could transfer to a people mover serving the terminals.[77] Preliminary studies of the right-of-way, as well as a design contract, were conducted that year.[78] The extension was approved in 1975.[79] The Federal Urban Mass Transit Administration was less enthusiastic about the extension's efficacy and reluctant to give the Port Authority the $322 million it had requested for the project, about 80% of the projected cost.[80] Eventually, the administration agreed to back it,[81] but in 1977, the U.S. Supreme Court ruled that the two state legislatures had violated the U.S. Constitution's Contract Clause by repealing a covenant in the 1962 bond agreements in order to make the extension possible.[82][83] In June 1978, the extension, by then estimated to cost $600 million, was canceled in favor of improving bus service in New Jersey.[84]

Strikes

[edit]

Labor problems also beset PATH during this time.[85] After a January 1973 strike over salary increases was averted,[86] talks failed and workers walked out in April.[85][87] A month into the strike, negotiations broke down again;[88] the union returned to work in June.[89]

The 1980 New York City transit strike suspended service on the New York City Transit Authority (NYCTA)'s bus and subway routes for 10 days. A special PATH route ran from 33rd Street to World Trade Center via Midtown Manhattan, Pavonia–Newport, and Exchange Place during the NYCTA strike.[90] PATH motormen also threatened to go on strike during this time for different reasons. The special service was suspended in April after some workers refused overtime.[91]

In June 1980, PATH workers again went on strike for higher pay, their first such action since 1973.[92] During the strike, moisture built up in the tunnels and rust accumulated on the tracks; pumps in the underwater tunnels remained in operation, preventing the tubes from flooding.[93] Alternative service across the Hudson River was provided by "inadequate" shuttle buses through the Holland Tunnel.[94] The 81-day strike[93] was the longest in PATH's history.[95]

1980s and 1990s

[edit]

Substantial growth in PATH ridership during the 1980s required expansion and improvement of the railroad's infrastructure. The Port Authority announced a plan in 1988 that would allow stations on the Newark–WTC line to accommodate longer eight-car trains while seven-car trains could operate between Journal Square and 33rd Street.[96] Two years later, it announced a $1 billion plan to renovate the PATH stations and add new cars.[97] Video monitors were installed in stations to make money from advertising.[98] PATH also sought a fare hike, even though that would reduce its per passenger subsidy, to reduce its $135 million annual deficit.[99] By 1992, the Port Authority had spent $900 million on infrastructure improvements, including repairing tracks, modernizing communications and signaling, replacing ventilation equipment, and installing elevators at seven stations per the Americans with Disabilities Act of 1990 (ADA).[100]

A $225 million car maintenance facility was opened in Harrison in 1990. It replaced PATH's old Henderson Street Yard—a below-grade, open-air train storage yard at the northeast corner of Marin Boulevard and Christopher Columbus Drive just east of the Grove Street station.[101]

High tides from the December 1992 nor'easter flooded the PATH tunnels, including a 2,500–3,000-foot (760–910 m) section between Hoboken and Pavonia.[102] Most trains were stopped before reaching the floods, but one became stalled near Hoboken Terminal.[103] Some water pumps within the system were overwhelmed.[102] The Newark–World Trade Center service was not disrupted afterwards, but the Journal Square–33rd Street service was slowed because several spots along the route needed to be pumped out.[103] Service to Hoboken was suspended for 10 days, the longest disruption since the summer 1980 strike.[102]

A section of ceiling in the World Trade Center PATH station collapsed and trapped dozens during the 1993 World Trade Center bombing;[104][105] the station itself did not suffer any structural damage.[106] Within three days, PATH service to the station resumed.[107]

In the summer of 1993, the Port Authority banned tobacco advertisements in all trains and stations. A new wash for cars opened in mid-September 1993 in Jersey City, replacing the one at the 33rd Street terminal.[108] In April 1994, an ADA-compliant entrance to the Exchange Place station was opened.[109] Two years later, three trains began running express on the Newark–World Trade Center service for six months, cutting running time by 312 minutes.[110] Weekend Hoboken–World Trade Center service began in October 1996 on a six-month trial basis, and the express Newark–World Trade Center service was made permanent on the same day.[111][112]

21st century

[edit]

September 11, 2001, and recovery

[edit]
The temporary World Trade Center station opened in 2003.
Passengers applaud as the inaugural train from Newark arrives at PATH's temporary WTC station in 2003.

The World Trade Center station in Lower Manhattan, under the World Trade Center, one of PATH's two New York terminals, was destroyed during the September 11 attacks, when the Twin Towers above it collapsed. Just prior to the collapse, the station was closed and all passengers evacuated.[8]: 107  Service to Lower Manhattan was suspended indefinitely.[113] Exchange Place, the next-to-last station before World Trade Center, had to be closed as well because trains could not turn around there;[114] it had also suffered severe water damage.[115] A temporary PATH terminal at the World Trade Center was approved in December 2001 and projected to open in two years.[116] Shortly after the attacks, the Port Authority started operating two uptown services: Newark–33rd Street and Hoboken–33rd Street,[117][118] and one intrastate New Jersey service, Hoboken–Journal Square.[119][118] A single nighttime service was instituted: Newark–33rd Street (via Hoboken).[118]

In the meantime, modifications were made to a stub end tunnel to allow trains from Newark to reach the Hoboken-bound tunnel and vice versa. The modifications required PATH to bore through the bedrock between the stub tunnel and the Newark tunnels. The stub, the "Penn Pocket", had been built to take PRR commuters from Harborside Terminal on short turn World Trade Center to Exchange Place runs.[120] The new Exchange Place station opened in June 2003.[115] Because of the original alignment of the tracks, trains to or from Hoboken used separate tunnels from the Newark service. Eastbound trains from Newark crossed over to the westbound track just west of Exchange Place, where they reversed direction and used a crossover switch to go to Hoboken. Eastbound trains from Hoboken entered on the eastbound track at Exchange Place, then reversing direction and used the same crossover switch to get on the westbound track to Newark before entering Grove Street.[8]: 108 

PATH service to Lower Manhattan was restored when a new, $323 million second station opened in November 2003; the inaugural train was the same one that had been used for the evacuation.[121][8]: 108–110  The second, temporary station contained portions of the original station, but did not have heating or air conditioning. The temporary entrance was closed in July 2007, then demolished to make way for the third, permanent station; around the same time, the Church Street entrance opened.[122] A new entrance on Vesey Street opened in March 2008; the Church entrance was demolished.[123]

A curved white structure with projecting ribs at an angle, seen with budding trees in front and modern high-rises behind it in sunlight with a clear blue sky behind
The completed World Trade Center Transportation Hub in April 2016

The construction of the permanent four-platform World Trade Center Transportation Hub started in July 2008, when the first prefabricated "ribs" for the pedestrian walkway under Fulton Street were installed.[124] Platform A, the first part of the permanent station, opened in February 2014, serving Hoboken-bound riders.[125] Platform B and the remaining half of Platform A opened in May 2015.[126][127] The hub formally opened in March 2016 with part of the headhouse.[128][129][130] Platforms C and D, the last two, were opened that September.[131][127]

Hurricane Sandy

[edit]

In the early morning hours of October 29, 2012, all PATH service was suspended in advance of Hurricane Sandy. The following day, New Jersey Governor Chris Christie announced that PATH service would be out for 7–10 days due to the storm damage. Storm surge from the hurricane caused significant flooding to the Hoboken and Jersey City stations, as well as at the World Trade Center.[132] An image captured by a PATH security camera showing water flowing into Hoboken during the storm went viral online and became one of several representative images of the hurricane.[133] The first PATH trains after the hurricane were the Journal Square–33rd Street service, which resumed on November 6 and ran only in daytime.[134] Service was extended west to Harrison and Newark on November 12, in place of the Newark–World Trade Center service. Christopher Street and Ninth Street were reopened during the weekend of November 17–18, but remained closed for five days afterward.[135] Normal weekday service on the Newark–World Trade Center and Journal Square–33rd Street lines resumed on November 26. On weekends, trains operated using the Newark–33rd Street service pattern.[136]

The PATH station at Hoboken Terminal suffered major damage after floodwaters as high as eight feet (2.4 m) submerged the tunnels; it was closed for several weeks for $300 million worth of repairs.[137] The Newark–33rd Street route was suspended for two weekends in mid-December, with the Newark–World Trade Center running in its place, in order to expedite the return of Hoboken service.[138] Hoboken Terminal reopened in December for weekday daytime Hoboken–33rd Street service,[139] followed by the resumption of weekday 24-hour PATH service in early 2013.[140][141] The Hoboken–World Trade Center trains resumed in late January, and all normal service was restored by March.[142][143] The Downtown Hudson Tubes were severely damaged by Sandy. As a result, to accommodate repairs, service on the Newark–World Trade Center line between Exchange Place and World Trade Center was to be suspended during almost all weekends, except for holidays, in 2019 and 2020.[144] However, weekend service was restored in June 2020, six months ahead of schedule.[145]

2010s improvements

[edit]

The Port Authority began rebuilding the Harrison station in 2009.[146] It has longer and wider platforms to allow 10-car trains; street-level-to-platform elevators within the platform extensions, in compliance with the ADA, and architectural modifications.[147] The westbound platform of the new Harrison station opened to the public in October 2018[148][149] and the eastbound one the following June.[150]

In January 2010, Christopher O. Ward, as executive director, announced that PATH would be spending $321 million on communications-based train control (CBTC) with Siemens' Trainguard MT, upgrading its signal system for an increase in ridership.[151] CBTC would replace a four-decade old fixed-block signaling system.[152] It would reduce the headway time between trains, allowing more to run during rush hours. At the same time, the entire PATH fleet was replaced with 340 CBTC-equipped PA5 cars, built by Kawasaki Railcar. The original contract was completed in 2011; additional cars were delivered in subsequent years.[153][154] PATH's goal was to increase passenger capacity from 240,000 passengers a day to 290,000. The entire CBTC system was originally expected to become operational in 2017.[151][155] The Port Authority also spent $659 million to upgrade 13 platforms on the Newark–World Trade Center line to accommodate 10-car trains; until then, the line could only run eight-car trains.[154]

Along with CBTC, PATH began installing positive train control (PTC), another safety system, during the 2010s, per a Federal Railroad Administration (FRA) mandate that all American railroads have it by the end of 2018.[156] The Newark–World Trade Center line west of Journal Square was converted to PTC in April 2018, followed by the segments of track east of Journal Square the following month. This caused delays across the entire system when train operators had to slow down and manually adjust their trains to switch between the two signaling systems. PTC was tested on the Uptown Hudson Tubes from July to October 2018, forcing weekend closures.[157][158] PTC was finished in November 2018, a month ahead of schedule;[159] and the entire system was converted by December.[152]

The Port Authority also installed two amenities in all PATH stations. Cellphone service was added for all customers by early 2019.[160] Countdown clocks, displaying the time the next train arrives, were installed in all PATH stations that year.[161] Subsequently, in June 2019, the Port Authority released the PATH Improvement Plan, calling for over $1 billion in investments, including $80 million to extend Newark–World Trade Center line platforms, as well as funding for two ongoing projects: $752.6 million to complete the CBTC system by 2022 and $215.7 million on the new PA5 cars by 2022. The goal is to increase train frequencies on the Newark-World Trade Center line by 40 percent, and 20 percent on other lines, during rush hours.[162][163][164] Every train on the Newark–World Trade Center line would be nine cars long. In addition, the platform at Grove Street would be extended eastward, at the Marin Boulevard end of the station, and two additional cross-corridors would be added at Exchange Place. The Port Authority would also allocate funds to study the implementation of 10-car trains. In September 2019, service on the Newark–World Trade Center and Journal Square–33rd Street lines would be increased by 10 percent during rush hours, reducing the headway between trains from four minutes to three.[162]

2020s

[edit]

In 2019, the last year before the onset of the COVID-19 pandemic, the PATH carried an average of 284,000 people per day.[165] The second quarter of 2020, which included the nadir of COVID-19 pandemic across the New York metropolitan area, was the worst quarter in PATH's history, with a $777 million decline in revenues throughout all of the PANYNJ's facility and a specific ridership decline of 94 percent on the PATH system.[166] Train service returned to 96 percent of 2019 levels in June 2020, yet ridership continued to lag far below pre-pandemic numbers, rebounding to only 60 percent of 2019 ridership by February 2022.[167] Amid the spread of the Omicron variant, PANYNJ was projected to reach $3 billion in pandemic losses by March 2022.[168] The platform-lengthening project was finished the same year.[169] In February 2023, it was announced that nine-car operation on the Newark–World Trade Center line would begin the next month;[170] nine-car trains began operating on March 22, 2023.[171]

PANYNJ commissioners voted in late 2023 to spend $230 million replacing some wheel sets on the PA5 fleet and replacing tracks on the New Jersey side.[172] In 2024, the PANYNJ announced that it would spend $430 million to refurbish four stations and replace railroad switches as part of the PATH Forward program.[173][174]

Proposed expansions

[edit]

Newark Airport extension proposals

[edit]

In the mid-2000s, a Newark Airport extension was again considered as the Port Authority allocated $31 million for a feasibility study of extending service two miles (3.2 km) from Newark Penn Station,[175] estimated at that time to cost $500 million;[176] the study began in 2012.[177] In September 2013, Crain's reported that New Jersey Governor Chris Christie would publicly support the extension, estimated by then to cost $1 billion.[178] The governor asked that the airport's largest operator, United Airlines, consider flying to Atlantic City International Airport as an enticement to further the project.[179]

A train station with overhead lines and four tracks between two sheltered platforms, both wet, under cloudy skies. Letters across an overhead walkway spell out "Newark Liberty International Airport"
Newark Liberty Airport International Station, to which PATH service would be extended

In February 2014, the Port Authority's Board of Commissioners approved a 10-year capital plan that included the PATH extension to NJ Transit's Newark Liberty International Airport Station.[180][181][182] The alignment would follow the existing Northeast Corridor approximately one mile (1.6 km) further south to the Newark Airport station, where a connection to AirTrain Newark is available.[182] Five years of construction were expected to begin in 2018.[183]

In late 2014, there were calls for a reconsideration of Port Authority funding priorities. The PATH extension followed the route of existing Manhattan-to-Newark Airport train service (on NJ Transit's Northeast Corridor Line and North Jersey Coast Line as well as Amtrak's Keystone Service and Northeast Regional). On the other hand, there was no funding for either the Gateway Tunnel, a pair of commuter train tunnels that would supplement the North River Tunnels under the Hudson, or the replacement for the Port Authority Bus Terminal.[184] In December 2014, the PANYNJ awarded a three-year, $6 million contract to infrastructure design firm HNTB to do a cost analysis of the Newark Airport extension.[185]

In 2017, the PANYNJ released a 10-year capital plan that included $1.7 billion for the extension; at the time, construction was projected to start in 2020, with service in 2025.[186][187] A presentation at two December 2017 public meetings[188] showed the new PATH station would include a park-and-ride lot and a new entrance from the nearby Dayton neighborhood.[189] An extension of the PATH to Newark Airport was still being considered in mid-2022,[165] but the PANYNJ announced in March 2023 that it was deferring funding for the Newark Airport extension to a future capital plan.[190]

Marion station proposal

[edit]
The Marion Section separated by PATH tracks crossed by a pedestrian bridge

West of Journal Square in Jersey City, the NWK-WTC line runs through the Marion Section parallel to the Conrail Passaic and Harsimus Line freight line. A pedestrian bridge crosses the tracks. Since the 1980s, there have been calls for an infill station to be built there.[191][192] In 2018, the government of Jersey City and the PANYNJ reached an agreement that included a feasibility study for a potential station,[193][194] which resulted in the "Marion PATH Station Physical Feasibility Study".[195][196] The senior U.S. Senator, the Hudson County Executive, and the Mayor of Jersey City have written letters encouraging the PANYNJ to continue with the project.[197] The estimated cost of construction varies and could be funded by nearby real estate developers.[198][199]

Route operation

[edit]
Port Authority Trans-Hudson
Weekdays
 NWK-WTC 
Newark
Harrison
 JSQ-33 
Journal Square
Grove Street
Newport
 HOB-WTC  HOB-33 
Hoboken
Exchange Place
 HOB-WTC  NWK-WTC 
World Trade Center
Christopher Street
Ninth Street
14th Street
23rd Street
 JSQ-33  HOB-33 
33rd Street
Weekends, late nights, and holidays
 NWK-WTC 
Newark
Harrison
 JSQ-33 (via HOB) 
Journal Square
Grove Street
Newport
Hoboken
Exchange Place
 NWK-WTC 
World Trade Center
Christopher Street
Ninth Street
14th Street
23rd Street
 JSQ-33 (via HOB) 
33rd Street

PATH operates 24 hours a day, seven days a week. During weekday hours, PATH operates four train services,[200] direct descendants of the four original services operated by the H&M,[29] using three terminals in New Jersey and two in Manhattan.[200] During late nights, weekends, and holidays, PATH operates two services from two terminals in New Jersey and two in Manhattan.[200]

Each line is represented by a unique color on timetables and service maps, which also corresponds to the color of the marker lights on the front of trains. The Journal Square–33rd Street (via Hoboken) service is the only line represented by two colors (yellow and blue), since it is a late-night/weekend/holiday combination of PATH's two midtown services, Journal Square–33rd Street and Hoboken–33rd Street. During peak hours, trains operate every four to eight minutes on each service. Every PATH station except Newark and Harrison is served by a train every two to three minutes, for a peak-hour service of 20–30 trains per hour.[200]

In 2018, PATH saw 81.7 million passengers. As of June 2019, the system is used by over 283,000 passengers per weekday; almost 105,000 per Saturday; 75,000 per Sunday; and 94,000 per holiday. The busiest station is World Trade Center, whose 46,000 average passengers per day is over 10 times the daily traffic of Christopher Street, the least busy station. Ridership in 2018 was down by around a million compared to 2017[201] but it was still nearly a record for PATH operation, having increased 10 million from 2013.[202]

These levels of ridership notwithstanding, PATH runs at a deficit, losing about $400 million per year. While some of its recent improvements, particularly in Harrison, have spurred local development, it cannot benefit from that directly as the Port Authority is limited to the revenue it makes from the fees, fares, and tolls it collects, with the state and local governments collecting the sales, income and property taxes arising from development. Its costs are correspondingly increased by having to comply with FRA regulations. PATH is thus subsidized by the Port Authority from surpluses at its airports and seaports.[202]

Services

[edit]

The PATH system has 13.8 miles (22.2 km) of route mileage, counting route overlaps only once.[203] During the daytime on weekdays, four services operate:[200]

Between 11 p.m. and 6 a.m. Monday to Friday, and all-day Saturday, Sunday, and holidays, PATH operates two train services:[200]

Prior to 2006, Hoboken–World Trade Center and Journal Square–33rd Street services were offered on Saturday, Sunday, and holidays between 9 a.m. and 7:30 p.m. In April 2006, these services were indefinitely discontinued at those times and replaced with the Journal Square–33rd Street (via Hoboken) service.[204] During off-peak hours, passengers wanting to travel from Hoboken to Lower Manhattan were told to take the Journal Square–33rd Street (via Hoboken) service to Grove Street and transfer to the Newark–World Trade Center train.[200]

PATH does not normally operate directly from Newark to Midtown Manhattan. Passengers wanting to travel from Newark to Midtown via PATH are told to transfer to the Journal Square-33rd Street service at Journal Square or Grove Street.[200] However, after both the September 11 attacks and Hurricane Sandy, special Newark–33rd Street services were operated to compensate for the complete loss of service to Lower Manhattan.[205][140] An intrastate Journal Square–Hoboken service was also operated after the attacks.[119] The Journal Square–Hoboken and Newark–33rd Street services instituted after the attacks were canceled by 2003.[205]

From July to October 2018, because of PTC installation on the Uptown Hudson Tubes, the Journal Square–33rd Street (via Hoboken) service was suspended on most weekends.[206] In the meantime, it was replaced by the Journal Square–World Trade Center (via Hoboken) and the restored Journal Square–Hoboken services, since all stations between Christopher and 33rd Streets were closed during the weekends.[157][158]

Lengths of trains on all lines except the Newark–World Trade Center line are limited to seven cars, since the platforms at Hoboken, Christopher Street, Ninth Street, and 33rd Street can only accommodate that many and cannot be extended.[207] In 2009, the Port Authority started upgrading platforms along the Newark–World Trade Center line so that it could accommodate 10-car trains.[154] That line has accommodated nine-car trains in 2023, eight-car trains being the prior.

Network map

[edit]

Map

Station list

[edit]
Station Services State City Opened Closed County / Borough Ridership (2018)[208] Rank
Ninth Street      HOB–33
     JSQ–33
NY New York February 25, 1908[23] Manhattan 1,500,499 13
14th Street      HOB–33
     JSQ–33
NY New York February 25, 1908[23] Manhattan 2,700,912 9
19th Street NY New York February 25, 1908[23] August 1, 1954[56][209] Manhattan
23rd Street      HOB–33
     JSQ–33
NY New York June 15, 1908[26] Manhattan 2,553,706 11
28th Street NY New York November 10, 1910[32] September 24, 1939[210] Manhattan
33rd Street      HOB–33
     JSQ–33
NY New York November 10, 1910[32] Manhattan 10,039,352 2
Christopher Street      HOB–33
     JSQ–33
NY New York February 25, 1908[23] Manhattan 1,507,614 12
Exchange Place      NWK–WTC
     HOB–WTC
NJ Jersey City July 19, 1909[27] Hudson 5,129,804 8
Grove Street      NWK–WTC
     JSQ–33
NJ Jersey City September 6, 1910[30] Hudson 6,289,356 6
Harrison      NWK–WTC NJ Harrison June 20, 1937[55] Hudson 2,571,340 10
Hoboken      HOB–WTC
     HOB–33
NJ Hoboken February 25, 1908[23] Hudson 8,267,843 4
Hudson Terminal NY New York July 19, 1909[27] July 2, 1971[211] Manhattan
Journal Square      NWK–WTC
     JSQ–33
NJ Jersey City April 14, 1912[24]: 2  Hudson 8,160,293 5
Manhattan Transfer NJ Harrison October 1, 1911[33] June 20, 1937 Hudson
Newark      NWK–WTC NJ Newark June 20, 1937[55] Essex 8,789,165 3
Newport      HOB–WTC
     JSQ–33
NJ Jersey City August 2, 1909[28] Hudson 5,683,751 7
Park Place NJ Newark November 26, 1911[34] June 20, 1937 Essex
World Trade Center      NWK–WTC
     HOB–WTC
NY New York July 6, 1971[74] Manhattan 18,539,767 1

All New Jersey stations, as well as the World Trade Center and 33rd Street terminals in New York, are compliant with the Americans with Disabilities Act of 1990. Harrison, the last non-accessible station in New Jersey, was made fully accessible in 2019.[212] The only non-accessible stations are the four intermediate stations on the Manhattan side of the Uptown Tubes–Christopher Street, Ninth Street, 14th Street, and 23rd Street.[213]

Panoramic view of the 33rd Street station

Fares

[edit]

The Port Authority charges a single flat fee to ride the PATH system, regardless of distance traveled. As of March 1, 2022, a single PATH ride is $2.75; two-trip tickets are $5.50; 10-trip, 20-trip, and 40-trip cards charge $2.60 per trip; a single-day unlimited, $10.50; a seven-day unlimited, $36.00; and a 30-day unlimited, $110.25. A senior SmartLink costs $1.25 per trip.[214] Single ride tickets are valid for two hours from time of purchase.[215] While some PATH stations are adjacent to or connected to New York City Subway, Newark Light Rail, Hudson-Bergen Light Rail, and NJ Transit commuter rail stations, there are no free transfers between these different, independently run transit systems.[216] PATH began testing out a new contactless payment system called TAPP, similar to MTA's OMNY system, at some stations in December 2023.[217][218] TAPP readers accept only debit and credit cards and digital wallets; the SmartLink cards and OMNY are not compatible with the readers.[219]

History

[edit]

Tier-based fares

[edit]

The H&M used a tier-based fare system where a different fare was paid based on where the passenger was traveling. For instance, prior to September 1961, an interstate fare to or from all stations except Newark Penn Station was 25 cents, while an intrastate fare was 15 cents. That month, the interstate fare was increased to 30 cents, and the intrastate fare to 20 cents. A fare to or from Newark Penn, regardless of the origin or destination point, was 40 cents because the station's operations were shared with the Pennsylvania Railroad at the time.[220] Under Port Authority operation, the PATH fare to and from Newark was lowered in 1966, standardizing the interstate fare to 30 cents.[221] The intrastate fare of 15 cents was doubled in 1970, resulting in a flat rate for the entire system.[222]

Tokens

[edit]

PATH fares were paid with brass tokens starting in 1965. The Port Authority ordered 1 million tokens in 1962 and bought a half-million more in 1967. The Port Authority discontinued the sale of tokens in 1971 as a cost-cutting measure, since it cost $900,000 a year to maintain the token fare system. The agency replaced the turnstiles in its stations with new ones that accepted the 30-cent fare in exact change.[223]

QuickCards

[edit]

A paper ticket called the QuickCard, introduced in June 1990,[224] was valid only on the PATH system. It stored fare information on a magnetic stripe.[225][226]

The QuickCard was replaced by the SmartLink card in 2008[227] as sales were phased out across the system and at NJ Transit ticket machines.[228][229] By late 2008, PATH had deactivated all turnstiles that accepted cash; they continued to accept the various cards.[229]

The QuickCard was replaced by SmartLink Gray, a non-refillable, disposable version of the SmartLink card. This card was sold at selected newsstand vendors and was available in 10–, 20– and 40–trip increments. Unlike regular SmartLink cards, SmartLink Gray cards had expiration dates. SmartLink Gray was itself discontinued in January 2016.[230]

Current payment methods

[edit]
[edit]

PATH's official method of fare payment is a smart card known as SmartLink. The SmartLink was developed at a cost of $73 million, and initially was intended as a regional smart card that could be deployed on transit systems throughout the New York metropolitan area.[225] It was first made available in July 2007 at the World Trade Center.[231] The SmartLink can be connected to an online web account system allowing a cardholder to register the card and monitor its usage; it allows for an automatic replenishment system linked to a credit card account, wherein the card balance is automatically refilled when five trips remain (for multiple-trip cards) or five days (for unlimited-ride cards).[232]

MetroCard

[edit]
SmartLink turnstiles at the Exchange Place station

PATH fare payment may also be made using single-ride, two-trip, and pay-per-ride MetroCards, the standard farecard of New York's Metropolitan Transportation Authority (MTA).[233] The MetroCard is a magnetic stripe card, like the QuickCard. PATH riders paying their fare using MetroCard insert the card into a slot at the front of the turnstile, which reads the card and presents the MetroCard to the rider at a slot on the top of the same turnstile.[234] Other types of MetroCards, including unlimited-ride MetroCards, are not accepted on PATH.[235]

Plans for using the MetroCard on PATH date to 1996, when the Port Authority and MTA first considered a unified fare system. At the time, the MetroCard was still being rolled out on the MTA system, and more than 80% of PATH riders transferred to other modes of transportation at some point in their trip.[226] In November 2003, the Port Authority announced that the MetroCard would be allowed for use on PATH starting the following year.[121] The Port Authority started implementing the MetroCard on PATH in 2005, installing new fare collection turnstiles at all PATH stations. These turnstiles allowed passengers to pay their fare with a PATH QuickCard or an MTA Pay-Per-Ride MetroCard.[236] MetroCard vending machines are located at all PATH stations. The machines sell Pay-Per-Ride MetroCards; allow riders to refill SmartLink cards; and sell Single Ride PATH tickets for use only on the PATH system. There are two types of MetroCard vending machines: large machines, which sell both MetroCards and SmartLinks and accept cash, credit cards, and transit benefits cards; and small machines, which do not accept cash or sell PATH single-ride tickets but otherwise perform the same functions as the large vending machines.[214]

In 2010, PATH introduced a $4 two-trip card using the standard MetroCard form. All PATH stations, except for the uptown platforms at 14th and 23rd Streets, contain blue vending machines which sell this card. The front of the card is the standard MetroCard (gold and blue) but on the reverse, it has the text "PATH 2-Trip Card", "Valid for two (2) PATH trips only", and "No refills on this card". The user must dispose of the card after the trips are used up because the turnstiles do not keep (or capture) the card as was done with the discontinued QuickCard.[214]

TAPP

[edit]
TAPP turnstiles

In June 2019, the Port Authority announced it was in talks with the MTA to implement the new OMNY fare payment system on PATH. Under the announced plan, OMNY would be available to PATH riders by 2022, with both SmartLink and MetroCard being phased out by 2023.[162] In November 2021, the Port Authority indicated that it would instead implement its own fare payment system, which would be similar to OMNY. This fare system is named TAPP, short for Total Access PATH Payment,[237] and is being tested as of December 2023. TAPP accepts debit and credit cards and phones for fare payment, but does not accept OMNY cards.[217][218] By March 2024, TAPP-compatible turnstiles had been enabled at six stations.[238][239] The rollout of TAPP at all New Jersey stations was completed by early May 2024[240][241] and was rolled out at all stations in New York later that month.[242]

Rolling stock

[edit]

Current roster

[edit]
The PA5 cars at Newark Penn Station
Interior of a PA5 car

As of 2023, there is only one model, the PA5.[153] The cars are 51 feet (16 m) long by 9.2 feet (2.8 m) wide, a smaller loading gauge compared to similar vehicles in the US, due to the restricted structure gauge through the tunnels under the Hudson River. They can reach 55 mph (89 km/h) in regular service. Each car seats 35 passengers, in longitudinal "bucket" seating, and can fit a larger number of standees in each car. PA5 cars have stainless steel bodies and three doors on each side. LED displays above the windows (between the doors) display the destination of that particular train. The PA5 cars are coupled and linked into consists up to 8 cars long, with conductors' controls on all cars and engineers' cabs on the "A" (driving) cars; trains on the Newark–World Trade Center line will be lengthened to 10 cars as part of the line's 2010s upgrades.[243]

In 2005, the Port Authority awarded a $499 million contract to Kawasaki to design and build 340 new PATH cars under the PA5 order to replace the system's entire existing fleet.[3] With an average age of 42 years and some cars dating back as far as 1964, the fleet was the oldest of any operating heavy rail line in the United States. The Port Authority announced that the new cars would be updated versions of the MTA's R142A cars. The first of these new cars entered revenue service in 2009;[244] all of them were delivered over the next two years.[153] The Port Authority exercised a subsequent contract for 10 additional PA5 cars, bringing the total to 350.[3]

As part of the fleet expansion program and signal system upgrade, the Port Authority had the option to order a total of 119 additional PA5 cars; 44 would be used to expand the NWK–WTC line to 10-car operation while the remaining 75 would be used to increase service frequencies after communication-based train control (CBTC) was implemented throughout the system by the end of 2018.[245] In December 2017, the Port Authority exercised an option to buy 50 extra PA5 cars for $150 million, for an ultimate total of 400 PA5 cars.[246][247] Subsequently, in July 2018, Kawasaki was awarded a $240 million contract to refurbish the 350 existing PA5 cars between 2018 and 2024. The contract also called for Kawasaki to build and deliver 72 new PA5 cars starting in 2021, for a total of 422 cars;[248] the first of the additional PA5 cars arrived in September 2022.[249] The new cars are being built by Kawasaki Heavy Industries in the U.S. at Lincoln, Nebraska and tested in Yonkers, New York. The 350 existing cars are being refurbished in Yonkers.[250]

Since 1990, all PATH trains are stored and maintained at the Harrison Car Maintenance Facility in New Jersey, located east of the Harrison station. Another train storage yard (Waldo Yard) exists east of the Journal Square station.[251] If the Newark Airport extension is built, a third train storage yard would be built at the airport.[189]

Rolling stock Year built Builder Car body Car numbers Total built Notes
PA5 2008–2022 Kawasaki Stainless steel 5600–5829 (A cars)
5100–5219
5300–5371[252] (C cars)
340 base order
119 in fleet expansion option (72 in progress.[248])
"A" cars have cab units, "C" cars have no cabs[253]
Siemens SITRAC 3-phase AC IGBT-VVVF traction system, upgradable to CBTC signalling compatibility, 3 doors per side, prerecorded station announcements

Former roster

[edit]
PA4 at Journal Square Transportation Center
A PA1 model leaving the 14th Street station

Before the Port Authority takeover, the H&M system used rolling stock series that were given letters from A to J. All of these cars, except for the D and H series, were known as "black cars" for their color.[254][255][24]: 6  There were a total of 325 cars in series A through J,[254] of which 255 were black cars.[24]: 6  The first 190 cars, in classes A through C, were ordered for the initial H&M service and delivered in 1909–1911. The cars, which were built in seven modular segments, measured 48.25 feet (14.71 m) long with a loading gauge of 8.83 feet (2.69 m) and a height of 12 feet (3.7 m), with longitudinal seating and three doors on each side. They were ordered to the narrow specifications of the Hudson Tubes, and were light enough that they could be tested on the Second Avenue elevated in Manhattan, which could only support lightweight trains.[25]: 2 

Seventy-five cars in classes E through G were added in 1921–1923, allowing the H&M to lengthen train consists from six to seven cars each to eight. Although classes E-G had similar exterior dimensions to classes A-C, the E-G series had higher capacity, were heavier, and had substantially different window designs compared to the A-C series.[24]: 6  The last order of black cars, the 20 cars in series J, was delivered in 1928.[24]: 6–7  Many of the black cars remained in service from their inception until the H&M's bankruptcy in 1954. By that time, they required considerable maintenance.[255]

The PRR and H&M joint service comprised 40 cars in classes D and H, which were owned by the H&M, as well as 72 cars from the MP38 class, which were owned by the PRR.[254] Sixty MP38s and 36 Class D cars were delivered in 1911, when the service first operated.[8]: 43 [256] In 1927, an additional 12 MP38 cars were ordered under the MP38A classification, as well as four Class H cars.[254][24]: 6  As a result of the different manufacturers and the long duration between the two pairs of orders, the Class D and MP38 cars' designs were noticeably different from the Class H and MP38A cars' designs.[24]: 6–7  The red cars were branded with the names of both companies to signify the partnership.[257] The red cars suffered from corrosion and design defects, and were unusable by 1954.[255] All of the red and black car series were designed to be operationally compatible.[24]

The MP52 and K-class, which replaced the D-class and the 60 MP38s ordered in 1911, comprised an order of 50 cars. The 30 MP52s and 20 K-classes were purchased by the PRR and H&M respectively and delivered in 1958 in order to save money on maintenance.[254][258]

After the Port Authority took over operation of the H&M Railroad in 1962, it started ordering new rolling stock to replace the old H&M cars.[70] St. Louis Car built 162 PA1 cars in 1964–1965.[8]: 101 [69][70] St. Louis also built the PA2, a supplementary order of 44 cars, in 1966–1967.[8]: 101 [71] Hawker Siddeley built 46 PA3 cars in 1972.[8]: 101 [71] The 95 PA4s were built by Kawasaki Heavy Industries in 1986–1987, replacing the K-class and MP52 series.[8]: 101 [259]

PA1, PA2, and PA3 cars had painted aluminum bodies, and two doors on each side. Back-lit panels above the doors displayed the destination of that particular train: HOB for Hoboken, JSQ for Journal Square, NWK for Newark, 33 for 33rd Street, and WTC for World Trade Center.[8]: 81  In the mid-1980s, Kawasaki overhauled 248 of the 252 PA1-PA3 cars at their factory in Yonkers, New York, and repainted them white to match the PA4 cars then being delivered.[8]: 81 [259][260] PA4 cars had stainless steel bodies, and three doors on each side. Back-lit displays above the windows (between the doors) displayed the destination of that particular train.[8]: 81  All four series were designed to be operationally compatible.[261] Although all four orders contained "A" cars with cabs at one end, the PA1 and PA2 orders also contained some "C" cars. Trains could comprise three to eight cars, but in order to operate, there had to be an even number of "A" cars in the consist, including one "A" car at each end.[207] All PA1-PA4 equipment was retired from passenger service by 2011.[153]

Rolling stock Year built Year retired Builder Car body Car numbers Total built Notes[8]: 101 [24][25][254][256]
A 1908 1955 Pressed Steel and American Car & Foundry painted steel (black) 200–249 50
B 1909 1964–1967 Pressed Steel painted steel (black) 250–339 90
C 1910 1964–1967 American Car & Foundry painted steel (black) 340–389 50
D 1911 1958 Pressed Steel painted steel (red) 701–736 36
  • "Red cars" used in the H&M/PRR joint service and owned by the H&M.
  • Car 728 was wrecked at Hudson Terminal on August 23, 1937.[263]
MP38 1911 1964–1967 Pressed Steel painted steel (red) 1901–1960 60
  • "Red cars" used in the H&M/PRR joint service and owned by the PRR.
E 1921 1966–1967 American Car & Foundry painted steel (black) 401–425 25
F 1922 1966–1967 American Car & Foundry painted steel (black) 426–450 25
G 1923 1966–1967 American Car & Foundry painted steel (black) 451–475 25
H 1927 1966–1967 American Car & Foundry painted steel (red) 801–804 4
  • "Red cars" used in the H&M/PRR joint service and owned by the H&M.
MP38A 1927 1966–1967 American Car & Foundry painted steel (red) 1961–1972 12
  • "Red cars" used in the H&M/PRR joint service and owned by the PRR.
J 1928 1966–1967 American Car & Foundry painted steel (black) 501–520 20
MP52 1958 1987 St. Louis Car Company painted aluminum and steel 1200–1229 30
  • Replaced the D series.
  • Owned by PRR and used primarily in H&M/PRR joint service, later PATH service.
K 1230–1249 20
  • Replaced the D series.
  • Owned by H&M and used primarily in H&M/PRR joint service, later PATH service.
  • First cars in the H&M/PRR/PATH system to feature air-conditioning.[265]
PA1 1964–1965 2009–2011 St. Louis Car Company painted aluminum 100–151 ("C" cars)
600–709 ("A" cars)
162 (110 cab units, 52 trailers)
  • Replaced most B–J class and MP38 cars.
  • "A" cars have cab units, "C" cars-trailers have no cabs, 2 doors per side.
  • 143 (trailer) at Trolley Museum of New York (Kingston).
  • Cars 139 and 612 wrecked on September 11, 2001 (see below).
PA2 1966–1967 2009–2011 St. Louis Car Company painted aluminum 152–181 ("C" cars)
710–723 ("A" cars)
44 (14 cab units, 30 trailers)
  • Replaced all remaining B–J class and MP38 cars.
  • "A" cars have cab units, "C" cars-trailers have no cabs, 2 doors per side.
  • Car 160 wrecked on September 11, 2001 (see below).
PA3 1972 2009–2011 Hawker Siddeley Canada painted aluminum 724–769 46
  • All are cab units, 2 doors per side.
  • 745 at Shore Line Trolley Museum (BERA).
  • Car 750 wrecked on September 11, 2001 (see below).
PA4 1986–1987 2009–2011 Kawasaki Stainless steel 800–894 95
  • Replaced K class and MP52 series.
  • All are cab units, 3 doors per side.
  • Car 845 wrecked on September 11, 2001 (see below).
  • Most in work service.

A seven-car PATH train was left under the World Trade Center after September 11, 2001; though five of the cars were destroyed, cars 745 and 143 were not positioned directly beneath the tower and survived the collapse relatively intact. These two cars were cleaned and placed in storage while the remains of the rest of the train had been stripped of usable parts and scrapped. The cars were intended to be displayed in the National September 11 Memorial & Museum.[266] However, they were deemed too large to be displayed there; as a result, car 745 was instead donated to the Shore Line Trolley Museum,[267] while car 143 was donated to the Trolley Museum of New York.[268]

FRA railroad status

[edit]
View of the Dock Bridge, which is used by PATH but owned by Amtrak
View of the Dock Bridge, which is used by PATH but owned by Amtrak

While PATH operates as a typical intraurban heavy rail rapid transit system, it is legally a commuter railroad under the jurisdiction of the FRA, which oversees railroads that are part of the national rail network.[269] PATH's predecessor, the H&M, used to share trackage with the Pennsylvania Railroad between the Hudson interlocking near Harrison and Journal Square. The line also connected to the Northeast Corridor near Harrison station and also near Hudson tower.[8]: 43–44  Though there is no longer any through-running of mainline intercity trains into PATH tunnels, FRA regulations still apply to PATH because PATH's right-of-way between Newark and Jersey City is very close to the Northeast Corridor.[270] PATH also shares the Dock Bridge near Newark Penn Station with Amtrak and NJ Transit.[271]

While PATH operates under several grandfather waivers, it still must meet more stringent requirements than other American rapid transit systems, such as the proper fitting of grab irons to all PATH rolling stock, installation of PTC, and compliance with the federal railroad hours of service regulations. Additionally, all PATH train operators must be federally certified locomotive engineers, and the agency must conduct more detailed safety inspections than other rapid transit systems. These requirements increase PATH's per-hour operating costs relative to other rapid transit systems in the New York City and Philadelphia areas. For instance, it is three times more expensive to operate per hour than the New York City Subway despite having only a fraction of the latter system's length and ridership. The PANYNJ has sought to switch its regulator to the Federal Transit Administration, which oversees rapid transit, but the FRA has insisted that safety concerns require PATH to remain under its purview. Alternatively, the Port Authority has considered transferring PATH to NJ Transit.[251]

[edit]

PATH management has two principal passenger outreach initiatives: the "PATHways" newsletter, distributed for free at terminals, as well as the Patron Advisory Committee.[272][273] Other passenger outreach initiatives include "PATHursday", allowing passengers to provide enhancing service suggestions. Similarly, the "PATH Riders' Council" allows feedback about their system design, service, and decision-making. PATH has offered various "Community Poster Competitions" with schools, "Transit Lines Poetry Stories" featuring poet pieces tied with New York and New Jersey region, and "Arts In Transit" and "PATH Performs!" displaying local artists' work and performances.[274][275]

Media restrictions

[edit]

As of December 2015, PATH regulations state that all photography, filmmaking, videotaping, or creations of drawings or other visual depictions within the PATH system is prohibited without a permit and supervision by a PATH representative.[276]: 17  According to the rules, photographers, filmmakers, and other individuals must obtain permits through an application process.[276]: 18  Although it has been suggested that the restriction was put in place due to terrorism concerns, the restriction predates the September 11 attacks and the 1993 World Trade Center bombing.[277]

View from the front of a Newark-bound train, 1997

According to New Jersey newspaper Hudson Reporter, this ban excludes members of the general public who want to take pictures, and the photography and filmography ban only applies for commercial or professional purposes. The general public is allowed to take pictures of PATH stations and all other Port Authority facilities except in secure and off-limits areas.[277] There have been decisions from the United States Supreme Court stating that casual photography is covered by the First Amendment; the case law is mixed. Under the law, PATH employees may not force a casual photographer to destroy or surrender their film or images, but confiscations and arrests have occurred. Litigation following such confiscations or arrests have generally, but not always, resulted in charges being dropped and/or damages awarded.[278]

Tunnel decoration

[edit]

On trains bound for Newark or Hoboken from World Trade Center, a short, zoetrope-like advertisement was formerly visible in the tunnel before entering Exchange Place. There was another similar advertisement, visible from 33rd Street-bound trains between 14th and 23rd Streets near the abandoned 19th Street station.[279]

Every year, around Thanksgiving, PATH employees light a decorated Christmas tree at the switching station adjacent to the tunnel used by trains entering the Pavonia/Newport station. This tradition started in the 1950s when a signal operator hung a string of Christmas lights in the tunnel. While PATH officials were initially concerned about putting up decorations in the tunnel, they later acquiesced and the tradition continued. After the September 11 attacks, a backlit U.S. flag was put up beside the tree as a tribute to the victims.[280]

[edit]

PATH trains and stations have occasionally been the setting for music videos, commercials, movies, and TV programs. For instance, the White Stripes's video for "The Hardest Button to Button" was filmed at 33rd Street.[281] Additionally, the premiere for season 19 of Law & Order: Special Victims Unit was filmed in the World Trade Center station.[282] The PATH system is also often used as a stand-in for the New York City Subway,[283] as in John Wick: Chapter 2 where it was portrayed as a "Broad Street bound Z train".[284]

Major incidents

[edit]

Train collisions

[edit]
  • On August 31, 1922, two H&M trains collided in heavy fog at Manhattan Transfer, injuring 50 people, eight of them seriously.[285]
  • On July 22, 1923, another collision near Manhattan Transfer killed one person and injured 15 others.[286]
  • On January 16, 1931, a seven-car H&M train derailed a switch and collided with a wall at 33rd Street, injuring 19 passengers.[287]
  • On August 22, 1937, a 5-car H&M train crashed into a wall at Hudson Terminal, injuring 33 passengers.[288]
  • On November 26, 1938, 22 passengers were injured when an H&M train sideswiped a PRR engine in Kearny, east of the former Manhattan Transfer station.[289]
  • On April 26, 1942, a six-car H&M train derailed at Exchange Place. Five people were killed and 222 more were injured. A subsequent investigation found that the motorman was intoxicated.[290]
  • On December 17, 1945, a seven-car H&M train collided with a steel barrier on the Dock Bridge west of Harrison, killing the motorman and injuring 67 passengers.[291]
  • On December 13, 1958, an H&M train rear-ended another one at Journal Square, injuring 30 passengers, none seriously.[292]
  • On October 16, 1962, 26 people were injured in a crash between two H&M trains at Hudson Terminal.[293]
  • On July 23, 1963, a PATH train collided with a PRR engine east of Harrison, killing two passengers and injuring 28 more.[294][295]
  • On January 11, 1968, a rear-end accident at Journal Square injured 100 of the approximately 200 combined passengers on the two trains, 25 of them seriously.[296]
  • On October 21, 2009, a PATH train crashed into a bumper block at the end of the platform at 33rd Street. Approximately 13 of the 450 people on board suffered minor injuries; two crew members and five passengers were hospitalized. An investigation by the Port Authority determined that the cause was human error.[297]
  • On May 8, 2011, a PATH train crashed into a bumper block at Hoboken Terminal, injuring 34 people;[298][299] the NTSB said the train engineer failed to control the speed of the train as it entered the station.[300][301]
  • On October 10, 2019, a PATH train derailed and collided with the platform at Newark Penn Station. No one was on the train at the time.[302][303]

Other incidents

[edit]
  • A train near Exchange Place caught fire on June 3, 1982, injuring 28 people.[304]
  • Part of the ceiling at Journal Square fell onto the platform on August 8, 1983, killing two and injuring 12.[305][306] A subsequent investigation found that the ceiling collapse had occurred due to the station's poor design, bad supervision procedures during construction, and inadequate maintenance.[307]
  • In July 2006, an alleged plot to detonate explosives in the Downtown Hudson Tubes (initially said to be a plot to bomb the Holland Tunnel) was uncovered by the FBI. According to officials, this plan was unsound due to the strength of both tunnels, as well as various restrictions in both the Holland Tunnel and the PATH system. Three of the eight planners were arrested.[308]
  • On January 7, 2013, an escalator at Exchange Place suddenly reversed itself, resulting in five injuries. After the incident, all of the escalators in the PATH system were inspected.[309][310]

See also

[edit]

References

[edit]
  1. ^ "Transit Ridership Report Second Quarter 2024" (PDF). American Public Transportation Association. September 3, 2024. Retrieved September 5, 2024.
  2. ^ "Transit Ridership Report Fourth Quarter 2023" (PDF). American Public Transportation Association. March 4, 2024. Retrieved September 5, 2024.
  3. ^ a b c "Project Detail". Port Authority of New York and New Jersey. June 25, 2012. Archived from the original on June 12, 2018. Retrieved March 2, 2018.
  4. ^ a b c d e f g Fitzherbert, Anthony (June 1964). ""The Public Be Pleased": William G. McAdoo and the Hudson Tubes". Electric Railroaders Association, nycsubway.org. Retrieved January 9, 2012.
  5. ^ Dunlap, David W. (February 25, 2008). "Why PATH Rides Are Free Today". City Room. Retrieved April 24, 2018.
  6. ^ "Under the Hudson River by Tunnel About to Become a Reality; October 1 Will See the End of a Romance of Thirty-four Years' Struggle of Capital and Brains Against the Seemingly Insurmountable Obstacles of Nature". The New York Times. May 26, 1907. ISSN 0362-4331. Retrieved April 24, 2018.
  7. ^ a b Burr, S.D.V. (1885). Tunneling Under The Hudson River: Being a description of the obstacles encountered, the experience gained, the success achieved, and the plans finally adopted for rapid and economical prosecution of the work. New York: John Wiley and Sons. Archived from the original on January 22, 2009. Retrieved August 24, 2009.
  8. ^ a b c d e f g h i j k l m n o p q r s t u v w x y Cudahy, Brian J. (2002), Rails Under the Mighty Hudson (2nd ed.), New York: Fordham University Press, ISBN 978-0-82890-257-1, OCLC 911046235
  9. ^ "Work On The Tunnel Resumed". The New York Times. July 23, 1879. ISSN 0362-4331. Retrieved April 22, 2018.
  10. ^ "Twenty Men Buried Alive". The New York Times. July 22, 1880. ISSN 0362-4331. Retrieved April 22, 2018.
  11. ^ "The Hudson River Tunnel; Effort Making To Raise Sufficient Money To Complete It". The New York Times. March 18, 1893. ISSN 0362-4331. Retrieved April 22, 2018.
  12. ^ "Hudson Tunnel Open End To End". The New York Times. March 12, 1904. ISSN 0362-4331. Retrieved April 23, 2018.
  13. ^ Gilbert, Gilbert H.; Wightman, Lucius I.; Saunders, W.L. (1912). The Subways and Tunnels of New York. John Wiley & Sons. pp. 155–159.
  14. ^ "$100,000,000 Capital for M'Adoo Tunnels". The New York Times. December 12, 1906. ISSN 0362-4331. Retrieved December 29, 2017.
  15. ^ a b "M'Adoo Subway Wins Fight For Franchise". The New York Times. December 16, 1904. ISSN 0362-4331. Retrieved April 24, 2018.
  16. ^ "$21,000,000 Company For Hudson Tunnels". The New York Times. 1905. ISSN 0362-4331. Retrieved April 24, 2018.
  17. ^ "Tunnel Companies Join". New-York Tribune. January 10, 1905. p. 14. Retrieved September 30, 2020 – via newspapers.com Open access icon.
  18. ^ The Commercial & Financial Chronicle ...: A Weekly Newspaper Representing the Industrial Interests of the United States. William B. Dana Company. 1914.
  19. ^ "$100,000,000 Capital For M'Adoo Tunnels". The New York Times. December 12, 1906. ISSN 0362-4331. Retrieved April 24, 2018.
  20. ^ Davies, John Vipond (1910). "The Tunnel Construction of the Hudson and Manhattan Railroad Company". Proceedings of the American Philosophical Society. 49 (195). Philadelphia: American Philosophical Society: 164–187. JSTOR 983892.
  21. ^ The World Almanac and Encyclopedia. Press Publishing Company (The New York World). 1911. p. 105.
  22. ^ "Under The Hudson By Train". The New York Times. December 18, 1907. ISSN 0362-4331. Retrieved April 24, 2018.
  23. ^ a b c d e f "Trolley Tunnel Open to New Jersey". The New York Times. February 26, 1908. p. 1. ISSN 0362-4331. Retrieved October 27, 2008.
  24. ^ a b c d e f g h i j k l m n Chiasson, George (September 2015). "Rails Under the Hudson Revisited – The Hudson and Manhattan". Electric Railroaders' Association Bulletin. 58 (9): 2–3, 6–7. Retrieved April 10, 2018 – via Issuu.
  25. ^ a b c Chiasson, George (June 2015). "Rails Under the Hudson Revisited – The Hudson and Manhattan". Electric Railroaders' Association Bulletin. 58 (6): 2–3, 12, 14, 17. Retrieved April 10, 2018 – via Issuu.
  26. ^ a b "To Extend Hudson Tunnel". The New York Times. June 12, 1908. p. 6. ISSN 0362-4331. Retrieved July 19, 2011.
  27. ^ a b c "40,000 Celebrate New Tubes' Opening". The New York Times. July 20, 1909. ISSN 0362-4331. Retrieved April 24, 2018.
  28. ^ a b "Erie Commuters Held Up". The New York Times. August 3, 1909. p. 1. ISSN 0362-4331. Retrieved July 19, 2011.
  29. ^ a b c d e Chiasson, George (July 2015). "Rails Under the Hudson Revisited – The Hudson and Manhattan". Electric Railroaders' Association Bulletin. 58 (7): 2–3, 5. Retrieved April 10, 2018 – via Issuu.
  30. ^ a b "Subway Station Not Closed", The New York Times, August 26, 1910, p. 6.
  31. ^ a b "M'Adoo Would Build A West Side Subway". The New York Times. September 16, 1910. p. 10. ISSN 0362-4331. Retrieved July 19, 2011.
  32. ^ a b c "Open McAdoo Extension". The New York Times. November 10, 1910. p. 10. ISSN 0362-4331. Retrieved July 19, 2011.
  33. ^ a b "Improved Transit Facilities by Newark High Speed Line". The New York Times. October 1, 1911. p. XX2. ISSN 0362-4331. Retrieved July 19, 2011.
  34. ^ a b "Tube Service to Newark". The New York Times. November 26, 1911. p. 9. ISSN 0362-4331. Retrieved July 19, 2011.
  35. ^ "Under the Hudson by Four Tubes Now". The New York Times. July 18, 1909. p. 3. ISSN 0362-4331. Retrieved July 19, 2011.
  36. ^ Dunlap, David W. (October 26, 2008). "Another Ghost From Ground Zero's Past Fades Away". The New York Times. ISSN 0362-4331. Retrieved October 27, 2008.
  37. ^ "McAdoo Co. May Use Pennsylvania Depot". The New York Times. September 2, 1908. ISSN 0362-4331. Retrieved July 19, 2011.
  38. ^ "M'Adoo To Extend Hudson Tunnels". The New York Times. October 21, 1908. ISSN 0362-4331. Retrieved June 12, 2018.
  39. ^ a b c "Two New Subways Now Being Planned". The New York Times. February 14, 1909. ISSN 0362-4331. Retrieved April 24, 2018.
  40. ^ "M'Adoo Subway On To Grand Central". The New York Times. February 11, 1909. ISSN 0362-4331. Retrieved June 12, 2018.
  41. ^ "Inter-Tunnel Shaft In M'Adoo's Way". The New York Times. March 26, 1909. ISSN 0362-4331. Retrieved April 24, 2018.
  42. ^ "May Connect M'Adoo And Steinway Tubes". The New York Times. May 6, 1909. ISSN 0362-4331. Retrieved April 24, 2018.
  43. ^ "M'Adoo Extension To Be Ready In 1911". The New York Times. June 5, 1909. ISSN 0362-4331. Retrieved April 24, 2018.
  44. ^ "M'Adoo's Railroad Slow In Building". The New York Times. April 9, 1914. ISSN 0362-4331. Retrieved April 25, 2018.
  45. ^ "Hudson Tube Asks Delay". The New York Times. February 16, 1920. ISSN 0362-4331. Retrieved April 27, 2018.
  46. ^ "M'Adoo Ready To Run Triborough". The New York Times. November 19, 1910. ISSN 0362-4331. Retrieved April 26, 2018.
  47. ^ "Subway Contracts Solemnly Signed" (PDF). The New York Times. March 20, 1913. ISSN 0362-4331. Retrieved January 11, 2018.
  48. ^ Walker, James Blaine (1918). Fifty Years of Rapid Transit, 1864–1917. Law Printing Company. pp. 224–241. Retrieved July 17, 2019.
  49. ^ "McAdoo Tunnel Extension: Lines to the Oranges and Montclair, with Mountain Tunnels, Projected". The New York Times. March 29, 1909. ISSN 0362-4331. Retrieved April 24, 2018.
  50. ^ "Travel Here Fell 13,000,000". The New York Times. May 4, 1931. ISSN 0362-4331. Retrieved April 27, 2018.
  51. ^ a b "H. & M. Fight to Win Riders A Long and Frustrating Haul". The New York Times. September 28, 1960. ISSN 0362-4331. Retrieved June 12, 2018.
  52. ^ "Hudson Tube Terminus At 33d St. Closes Today". The New York Times. December 26, 1937. ISSN 0362-4331. Retrieved April 26, 2018.
  53. ^ "Hudson Tube Opens Terminal Today". The New York Times. September 24, 1939. ISSN 0362-4331. Retrieved April 15, 2018.
  54. ^ "Tube Terminal to Reopen". The New York Times. September 12, 1939. ISSN 0362-4331. Retrieved April 15, 2018.
  55. ^ a b c "New Station Open for Hudson Tubes". The New York Times. June 20, 1937. p. 35. ISSN 0362-4331. Retrieved July 19, 2011.
  56. ^ a b "H.&M. Station To Close". The New York Times. February 19, 1954. ISSN 0362-4331. Retrieved April 27, 2018.
  57. ^ "Hudson Tubes File Bankruptcy Plea". The New York Times. November 20, 1954. ISSN 0362-4331. Retrieved April 27, 2018.
  58. ^ "Hudson Tube Deal On Tax Approved". The New York Times. August 2, 1956. ISSN 0362-4331. Retrieved May 1, 2017.
  59. ^ "Subsidies Sought To Aid Commuting". The New York Times. April 16, 1956. ISSN 0362-4331. Retrieved April 30, 2018.
  60. ^ "Creditors Back Plan to Revamp Hudson and Manhattan Railroad". The New York Times. June 11, 1960. ISSN 0362-4331. Retrieved May 1, 2017.
  61. ^ Raskin, A. H. (May 13, 1953). "Tube Strike Ends With Pay Accord". The New York Times. ISSN 0362-4331. Retrieved April 30, 2018.
  62. ^ "Trains Run Again In Hudson Tubes". The New York Times. April 30, 1957. ISSN 0362-4331. Retrieved April 30, 2018.
  63. ^ Grutzner, Charles (December 29, 1961). "Port Unit Backs Linking Of H.&M. And Other Lines". The New York Times. ISSN 0362-4331. Retrieved May 1, 2017.
  64. ^ a b Wright, George Cable (1962). "2 States Agree On Hudson Tubes And Trade Center". The New York Times. ISSN 0362-4331. Retrieved April 30, 2018.
  65. ^ Stengren, Bernard (April 2, 1962). "Port Unit Sets Up Section For H.&M". The New York Times. ISSN 0362-4331. Retrieved April 30, 2018.
  66. ^ Wright, George Cable (January 23, 1962). "2 States Agree On Hudson Tubes And Trade Center". The New York Times. ISSN 0362-4331. Retrieved May 1, 2017.
  67. ^ "Authority Trains Winning Plaudits". The New York Times. September 4, 1967. ISSN 0362-4331. Retrieved September 4, 2019.
  68. ^ "Port Unit to Paint Stations of H. & M. On Taking Control". The New York Times. June 15, 1962. ISSN 0362-4331. Retrieved April 30, 2018.
  69. ^ a b "162 Cars Ordered for Hudson Tubes". The New York Times. 1964. ISSN 0362-4331. Retrieved April 30, 2018.
  70. ^ a b c "PATH Moves Toward All-Air-Conditioned Fleet". The New York Times. April 9, 1965. ISSN 0362-4331. Retrieved June 13, 2018.
  71. ^ a b c d Prial, Frank J. (January 15, 1973). "PATH Aims to Grow into New Commuter Line". The New York Times. ISSN 0362-4331. Retrieved May 1, 2018.
  72. ^ Iglauer, Edith (November 4, 1972). "The Biggest Foundation". The New Yorker.
  73. ^ a b Carroll, Maurice (December 30, 1968). "A Section of the Hudson Tubes Is Turned Into Elevated Tunnel". The New York Times. ISSN 0362-4331. Retrieved April 9, 2018.
  74. ^ a b Burks, Edward C. (July 7, 1971). "New PATH Station Opens Downtown" (PDF). The New York Times. p. 74. Retrieved May 30, 2010.
  75. ^ "Air-Cooled PATH Terminal in World Trade Center Opens Tuesday" (PDF). The New York Times. July 1, 1971. p. 94. Retrieved May 30, 2010.
  76. ^ Burks, Edward C. (October 14, 1973). "Jersey City Path Terminal to Open" (PDF). The New York Times. Retrieved November 14, 2022.
  77. ^ Burks, Edward C. (September 30, 1973). "PATH Is Changing Link to Airport". The New York Times. ISSN 0362-4331. Retrieved September 28, 2017.
  78. ^ Burks, Edward C. (July 8, 1973). "First Step Taken on a Rail Link to Newark Airport". The New York Times. ISSN 0362-4331. Retrieved September 28, 2017.
  79. ^ Sullivan, Ronald (February 11, 1975). "A PATH Extension Ordered By Byrne". The New York Times. ISSN 0362-4331. Retrieved September 28, 2017.
  80. ^ Burks, Edward C. (May 18, 1975). "U.S. Cool To PATH Plainfield Extension". The New York Times. ISSN 0362-4331. Retrieved September 28, 2017.
  81. ^ Burks, Edward C. (September 24, 1976). "U.S. Ready to Back Extension of PATH". The New York Times. ISSN 0362-4331. Retrieved September 28, 2017.
  82. ^ United States Trust Company of New York v. New Jersey, 431 U.S. 1 (1977)
  83. ^ Sullivan, Ronald (May 8, 1977). "High Court Snags New PATH Link". The New York Times. ISSN 0362-4331. Retrieved September 28, 2017.
  84. ^ "Byrne Drops Plan For Rail Extension". The New York Times. June 2, 1978. ISSN 0362-4331. Retrieved September 28, 2017.
  85. ^ a b "Full Impact of the Strike Against PATH Expected to Affect Commuters Today". The New York Times. April 2, 1973. ISSN 0362-4331. Retrieved May 1, 2018.
  86. ^ Fowler, Glenn (January 3, 1973). "Nixon Averts a PATH Strike By Creating Emergency Panel". The New York Times. ISSN 0362-4331. Retrieved May 1, 2018.
  87. ^ Malanga, Steven (April 5, 2016). "Bloated, Broke, and Bullied". city–journal.org. New Jersey On-Line. Retrieved April 6, 2017.
  88. ^ Stetson, Damon (May 1, 1973). "Walkout At PATH Enters 2d Month". The New York Times. ISSN 0362-4331. Retrieved May 1, 2018.
  89. ^ "Contract Ratified, PATH Strike By Carmen Ends After 63 Days". The New York Times. June 3, 1973. ISSN 0362-4331. Retrieved May 1, 2018.
  90. ^ Hanley, Robert (April 4, 1980). "Thousands Find a Way Downtown Via the PATH Route to Jersey". The New York Times. ISSN 0362-4331. Retrieved May 1, 2018.
  91. ^ "PATH is back, at least for now" (PDF). Yonkers Herald Statesman. April 9, 1980. p. 4. Retrieved June 15, 2018 – via Fultonhistory.com.
  92. ^ Andelman, David A. (June 12, 1980). "PATH Is Struck After Talks Fail". The New York Times. ISSN 0362-4331. Retrieved June 15, 2018.
  93. ^ a b Herman, Robin (September 1, 1980). "PATH Trains, Idle 81 Days in Strike, Rolling Again". The New York Times. ISSN 0362-4331. Retrieved June 15, 2018.
  94. ^ Hanley, Robert (July 1, 1980). "Shuttle Bus a Poor Alternative To Commuters in PATH Strike; Hoboken Fires Delay Buses". The New York Times. ISSN 0362-4331. Retrieved June 15, 2018.
  95. ^ Associated Press (August 28, 1980). "Tentative settlement reached on PATH strike" (PDF). Nyack Journal News. p. 1. Retrieved June 15, 2018 – via Fultonhistory.com.
  96. ^ Wilson, Joyce Wells (April 1988). "No Free Rides Business". Journal of New Jersey.
  97. ^ Yarrow, Andrew L. (August 12, 1990). "Port Authority Plans Outlined". The New York Times. ISSN 0362-4331. Retrieved June 12, 2018.
  98. ^ "The Media Business: TV Ads Are Spreading To Subways and Malls". The New York Times. January 1, 1990. ISSN 0362-4331. Retrieved June 12, 2018.
  99. ^ Levine, Richard (February 3, 1991). "As Economy Changes, the Port Authority Must Overcome Its Own Image". The New York Times. ISSN 0362-4331. Retrieved June 12, 2018.
  100. ^ Romano, Jay (March 15, 1992). "For PATH, On-Time Record of 90 Percent". The New York Times. ISSN 0362-4331. Retrieved June 12, 2018.
  101. ^ Darlington, Peggy (2012). "PATH Port Authority Trans-Hudson". nycsubway.org. Retrieved April 6, 2017.
  102. ^ a b c Peterson, Iver (December 22, 1992). "PATH Back In Operation After Repairs". The New York Times. ISSN 0362-4331.
  103. ^ a b Peterson, Iver (December 20, 1992). "PATH Takes Lesson From Storm's Close Calls". The New York Times. ISSN 0362-4331. Retrieved June 16, 2018.
  104. ^ McFadden, Robert D. (February 27, 1993). "Blast Hits Trade Center, Bomb Suspected; 5 Killed, Thousands Flee Smoke In Towers". The New York Times. ISSN 0362-4331.
  105. ^ "Trade Center blast blamed on bomb" (PDF). Greenfield Recorder. February 27, 1993. p. 1. Retrieved June 15, 2018 – via Fultonhistory.com.
  106. ^ Newkirk, Pamela (February 28, 1993). "Now, the Cleanup, Work begins assessing the damage". Newsday. New York.
  107. ^ Marks, Peter (March 1, 1993). "PATH and Subway Service Is Being Restored". The New York Times. ISSN 0362-4331.
  108. ^ Roberts, Donald (September 1993). "New Wash for PATH Cars". Pathways. 25 (3). Port Authority Trans-Hudson Corporation: 1–3.
  109. ^ "New Exchange Place Entrance Improves Access to Station". Pathways. 26 (1). Port Authority Trans-Hudson Corporation: 1. April 1994.
  110. ^ Pristin, Terry (April 30, 1996). "New Jersey Daily Briefing: Express PATH Service Begins". The New York Times. ISSN 0362-4331. Retrieved January 4, 2018.
  111. ^ Pristin, Terry (October 25, 1996). "PATH Trains Streamlined". The New York Times. ISSN 0362-4331. Retrieved January 4, 2018.
  112. ^ "Hoboken – WTC Weekend Direct Service Begins October 27". Pathways. 28 (2). Port Authority Trans-Hudson Corporation: 1, 3. October 1996.
  113. ^ "A Day Of Terror: Schedules: Disruptions and Closings Are Expected to Continue". The New York Times. September 12, 2001. ISSN 0362-4331. Retrieved June 16, 2018.
  114. ^ "Downtown Restoration Program – The Port Authority Of NY&NJ". Archived from the original on January 11, 2009. Retrieved October 22, 2014.
  115. ^ a b Weiser, Benjamin (June 29, 2003). "Closed Since 9/11, a PATH Station Is Set to Reopen Today". The New York Times. ISSN 0362-4331. Retrieved January 4, 2018.
  116. ^ Smothers, Ronald (December 14, 2001). "Port Authority Approves New PATH Station for Lower Manhattan". The New York Times. ISSN 0362-4331. Retrieved June 11, 2018.
  117. ^ "PATH will be running two services: Hoboken to 33rd Street; and Newark to 33rd Street". panynj.gov. Port Authority of New York and New Jersey. September 11, 2001. Archived from the original on June 12, 2018. Retrieved June 10, 2018.
  118. ^ a b c "PATH – A Subsidiary of The Port Authority of NY & NJ". panynj.gov. December 14, 2001. Archived from the original on December 14, 2001. Retrieved June 11, 2018.
  119. ^ a b "PATH Service Schedule for Thursday, 9/13/01 beginning at 6:00 a.m." panynj.gov. Port Authority of New York and New Jersey. September 12, 2001. Archived from the original on June 12, 2018. Retrieved June 10, 2018.
  120. ^ Bye, Patricia (2013). A Pre-event Recovery Planning Guide for Transportation. NCHRP report. Transportation Research Board. p. B7. ISBN 978-0-309-28338-0. Retrieved June 11, 2018.
  121. ^ a b Glucksman, Randy (December 2013). "Commuter and Transit Notes" (PDF). New York Division Bulletin. 46 (12). Electric Railroaders Association: 9–10. Archived from the original (PDF) on June 12, 2018. Retrieved May 25, 2017.
  122. ^ "The path to a new PATH". downtownexpress.com. Community Media. June 29, 2007. Archived from the original on July 9, 2007. Retrieved July 10, 2007.
  123. ^ Dunlap, David W. (April 1, 2008). "A New Twist at the PATH Station". The New York Times. Retrieved December 13, 2016.
  124. ^ Dunlap, David W. (July 11, 2008). "Among the Hard Angles, a Few New Curves". The New York Times. Retrieved July 13, 2008.
  125. ^ "Imperfect already?". City Blog. The New York Times. February 25, 2014. ISSN 0362-4331. Retrieved December 29, 2017.
  126. ^ Rivoli, Dan (May 7, 2015). "'Awesome' new PATH station at World Trade Center opens Thursday". AM New York. Retrieved May 7, 2015.
  127. ^ a b "Timeline of the Rebuilding Effort". World Trade Center. September 8, 2016. Archived from the original on December 18, 2016. Retrieved December 19, 2016.
  128. ^ Lorenzetti, Laura (March 3, 2016). "The World's Most Expensive Train Station Opens Today". Fortune. Retrieved December 20, 2016.
  129. ^ Verrill, Courtney (March 4, 2016). "New York City's $4 billion World Trade Center Transportation Hub is finally open to the public". Business Insider. Retrieved December 20, 2016.
  130. ^ "Port Authority Announces Opening of World Trade Center Transportation Hub". Port Authority of New York and New Jersey. January 19, 2016. Archived from the original on February 3, 2016. Retrieved January 29, 2016.
  131. ^ Higgs, Larry (May 26, 2016). "New platforms, bathrooms open at $4B WTC transit hub". NJ.com. Retrieved December 19, 2016.
  132. ^ Associated Press (November 1, 2012). "Christie: PATH trains out at least 7–10 days". online.wsj.com. Archived from the original on November 1, 2012. Retrieved June 13, 2018.
  133. ^ Goldman, Russell. "Hurricane Sandy: Live Updates". ABC News. American Broadcasting Company. Retrieved November 18, 2012.
  134. ^ "Limited PATH Service Resumes Between Journal Square And Manhattan". CBS New York. November 6, 2012. Retrieved April 30, 2018.
  135. ^ "Statement Of PATH Engineers And Transit Expert On The Resumption Of PATH Service From Newark To 33rd Street Beginning Monday, November 12, 2012" (Press release). Port Authority of New York & New Jersey. November 11, 2012. Archived from the original on May 15, 2021. Retrieved April 30, 2018.
  136. ^ "Maps & Schedule: PATH Partial Service Restoration". PATH website. The Port Authority of New York & New Jersey. Archived from the original on December 3, 2012. Retrieved November 18, 2012.
  137. ^ Boburg, Shawn (November 27, 2012). "PATH train repairs to cost $300M, with Hoboken station staying closed 'for weeks'". NorthJersey.com. Archived from the original on November 30, 2012. Retrieved October 2, 2013.
  138. ^ "Port Authority to Take Measures to Speed the Return of Service to Hoboken" (Press release). The Port Authority of New York & New Jersey. Archived from the original on September 26, 2019. Retrieved December 14, 2012.
  139. ^ Hack, Charles (December 19, 2012). "Hoboken commuters' verdict: reopened PATH train service was 'flawless'". The Jersey Journal. Retrieved December 20, 2012.
  140. ^ a b Newman, Andy (January 9, 2013). "PATH Trains to Resume 24-Hour Service". City Room. Retrieved April 30, 2018.
  141. ^ "PATH Trains to Resume 24-Hour Service Tonight" (Press release). The Port Authority of New York & New Jersey. January 9, 2013. Archived from the original on May 1, 2013. Retrieved February 11, 2013.
  142. ^ "Governors Christie and Cuomo Announce Full Restoration of PATH Service Between Hoboken and World Trade Center" (Press release). The Port Authority of New York & New Jersey. January 29, 2013. Archived from the original on May 15, 2021. Retrieved February 11, 2013.
  143. ^ Ferrer, Ana M. (January 10, 2013). "24-hour PATH service to 33rd St. restored for Jersey City, Hoboken, Newark riders". NJ.com. Retrieved June 13, 2018.
  144. ^ Walker, Ameena (December 5, 2018). "World Trade Center's PATH station will close for 45 weekends for repairs". Curbed. Retrieved January 3, 2019.
  145. ^ "SIX MONTHS AHEAD OF SCHEDULE, PATH WTC STATION REOPENS ON WEEKENDS FOLLOWING EXTENSIVE TUNNEL REPAIRS NECESSITATED BY SUPERSTORM SANDY". Port Authority of New York and New Jersey. June 5, 2020.
  146. ^ "Governor Christie And The Port Authority Mark Ongoing Work On New $256 Million Harrison PATH Rail Station". www.panynj.gov (Press release). Port Authority of NY & NJ. August 16, 2013. Archived from the original on February 23, 2017. Retrieved January 13, 2017.
  147. ^ Duger, Rose (March 12, 2009). "Harrison unveils $75M PATH renovation plan". The Jersey Journal. Archived from the original on June 29, 2011. Retrieved December 18, 2011.
  148. ^ "New Harrison PATH station opens". News 12 New Jersey. October 30, 2018. Retrieved October 31, 2018.
  149. ^ Higgs, Larry (October 31, 2018). "The newest PATH station cost $256M to build. Here's what it offers". NJ.com. Retrieved October 1, 2018.
  150. ^ "Renovated Harrison PATH station set to open to the public". News 12 New Jersey. June 12, 2019. Retrieved June 13, 2019.
  151. ^ a b "Siemens venture signs $321M PATH rail deal". Metro Magazine. January 19, 2010. Retrieved July 24, 2011.
  152. ^ a b Higgs, Larry (June 15, 2018). "Good news, PATH riders. Your month of misery, long delays may end Monday. Here's why". NJ.com. Retrieved June 15, 2018.
  153. ^ a b c d "Final new PATH train car put into service in Hoboken, more improvements to come". NJ.com. October 31, 2011. Retrieved March 2, 2018.
  154. ^ a b c "PATH adds shiny updated rail cars to its N.J.-to-N.Y.C. lines". NJ.com. Associated Press. July 10, 2009. Retrieved June 14, 2018.
  155. ^ "PATH resignalling deal confirmed". Railway Gazette International. January 19, 2010. Archived from the original on May 3, 2016. Retrieved October 1, 2019.
  156. ^ "PATH on track to finish positive train control installation by 2018 deadline". News 12 New Jersey. January 12, 2017. Archived from the original on March 2, 2018. Retrieved March 2, 2018.
  157. ^ a b "Schedules". Port Authority of New York and New Jersey. Archived from the original on June 29, 2021. Retrieved July 31, 2018.
  158. ^ a b "Stay on Track – PATH Weekend Closures – 2018" (PDF). Port Authority of New York and New Jersey. Archived from the original (PDF) on February 14, 2019. Retrieved July 31, 2018.
  159. ^ Berger, Paul (November 30, 2018). "PATH Train Completes Crucial Safety Upgrade Before Deadline". Wall Street Journal. Retrieved November 1, 2018.
  160. ^ Villanova, Patrick (November 6, 2018). "PATH introducing cellphone service to underground stations". NJ.com. Retrieved November 12, 2018.
  161. ^ Higgs, Larry (November 10, 2018). "PATH riders to lose weekend service on another line". NJ.com. Retrieved November 12, 2018.
  162. ^ a b c "PATH Implementation Plan" (PDF). PANYNJ. Archived from the original (PDF) on June 21, 2019. Retrieved June 20, 2019.
  163. ^ "Port Authority announces plan to increase PATH capacity, reduce delays". ABC7 New York. June 20, 2019. Retrieved June 21, 2019.
  164. ^ Higgs, Larry (June 20, 2019). "PATH will spend $1B to ease overcrowding, delays that mess up your commute". nj.com. Retrieved June 21, 2019.
  165. ^ a b Wilson, Colleen (June 20, 2022). "PATH is down half its riders. Why its leader is moving ahead with $1B expansion anyway". NorthJersey.com. Retrieved February 11, 2023.
  166. ^ "Port Authority Releases Six-month Financial Results: Covid-19 Related Volume Decline Causes Single Worst Quarter on RecorD" (Press release). New York: The Port Authority of New York and New Jersey. July 30, 2020. Archived from the original on March 26, 2022. Retrieved March 26, 2022.
  167. ^ Higgs, Larry (June 12, 2020). "PATH service will soon return to near pre-coronavirus levels with safeguards". NJ.com. NJ Advance Media. Archived from the original on June 13, 2020. Retrieved March 26, 2022.
  168. ^ Higgs, Larry (February 11, 2022). "NJ: Omicron hit the Port Authority so hard that 100 employees a day were quarantining". Mass Transit. NJ Advance Media. Archived from the original on February 18, 2022. Retrieved March 26, 2022.
  169. ^ Higgs, Larry (August 1, 2022). "Commuters will soon see results of $1B PATH improvement program that scored national award". nj. Retrieved October 21, 2023.
  170. ^ Higgs, Larry (February 9, 2023). "Longer trains are coming. They'll reduce crowding on PATH". nj.com. Retrieved February 10, 2023.
  171. ^ Higgs, Larry (March 22, 2023). "Commuters get relief as 9-car PATH trains debut on the Newark-World Trade Center line". nj. Retrieved March 23, 2023.
  172. ^ Higgs, Larry (November 21, 2023). "PATH will spend $230M to fix delay-causing track and train issues". nj. Retrieved November 23, 2023.
    "Port Authority commissioners approve $230 million for PATH projects". Trains. November 22, 2023. Retrieved November 23, 2023.
  173. ^ Higgs, Larry (April 6, 2024). "$430M upgrades will fix issues that delay commuters, PATH says". nj. Retrieved April 8, 2024.
  174. ^ Brachfeld, Ben (April 7, 2024). "Port Authority plans $430M rehabilitation for PATH train system". amNewYork. Retrieved April 8, 2024.
  175. ^ "FY 2004–06 Transportation Improvement Program" (PDF). Retrieved October 2, 2013.
  176. ^ "Governor Pataki and Mayor Bloomberg Announce Closing of Multi-billion Dollar Agreement to Extend Airport Leases" (Press release). Port Authority of New York & New Jersey. November 30, 2004. Archived from the original on September 24, 2015. Retrieved July 3, 2011.
  177. ^ "Port authority to undertake study on extending path rail service to newark liberty international airport" (Press release). PANYNJ. September 20, 2012. Archived from the original on October 11, 2012. Retrieved October 1, 2012.
  178. ^ Geiger, Daniel (September 11, 2013). "Sources: Christie to back $1B PATH extension in Newark". Crain's. Retrieved September 15, 2013.
  179. ^ Mann, Ted (October 3, 2002). "Mixed Signals on New PATH to the Airport". The Wall Street Journal. Retrieved October 2, 2013.
  180. ^ "Port Authority Board Approves Historic $27.6 Billion 10-Year Capital Plan That Focuses The Agency On Its Core Transportation Mission" (Press release). Port Authority of New York and New Jersey. February 19, 2014. Archived from the original on February 22, 2017. Retrieved February 20, 2014.
  181. ^ Boburg, Shawn (February 4, 2014). "Port Authority plans to extend PATH to Newark airport". The Record. Retrieved February 4, 2014.
  182. ^ a b "Port Authority Unveils Comprehensive, Proposed $27.6 Billion Capital Plan To Revitalize Region'a Transportation Assets" (Press release). PANYNJ. February 4, 2014. Archived from the original on July 17, 2014. Retrieved October 4, 2019.
  183. ^ Strunsky, Steve (October 1, 2014). "Construction on PATH airport extension to start in 2018". NJ.com. Retrieved October 22, 2014.
  184. ^ Magyar, Mark J. (October 24, 2014). "Christie's Airport PATH Deal Undercuts Rail Tunnel, PA Bus Terminal Needs". NJ Spotlight. Retrieved October 24, 2014.
  185. ^ Milo, Paul (December 17, 2014). "Port Authority hires firm to study PATH line extension to Newark Airport". The Star-Ledger. Retrieved December 17, 2014.
  186. ^ "PANYNJ Proposed Capital Plan 2017–2026" (PDF). Port Authority of New York and New Jersey. January 11, 2017. p. 38. Archived from the original (PDF) on June 25, 2021. Retrieved October 6, 2019.
  187. ^ Reitmeyer, John (May 1, 2017). "What's the Plan for PATH Service to Newark Liberty Airport?". NJ Spotlight News. Retrieved October 4, 2017.
  188. ^ Strunsky, Steve (November 28, 2017). "PATH extension to Newark airport set for public meetings this week". NJ.com. Retrieved November 29, 2017.
  189. ^ a b "PATH Extension Project Public Scoping Meetings" (PDF). Port Authority of New York and New Jersey. November 28, 2017. Retrieved April 28, 2018.
  190. ^ Higgs, Larry (March 14, 2023). "New rail station to be built ahead of delayed PATH Newark Airport extension". nj. Retrieved March 14, 2023.
  191. ^ Torres, Agustin C. (July 15, 2009). "Marion needs a PATH station". NJ.com. Retrieved May 8, 2016.
  192. ^ "New PATH Station in Jersey City Marion: PATH Trains". May 15, 2006. Retrieved August 20, 2023.
  193. ^ Fry, Chris (November 20, 2018). "Port Authority Could Soon Study Feasibility of Marion PATH Station in Jersey City". Jersey Digs. Retrieved May 27, 2021.
  194. ^ McDonald, Terrence T. (November 27, 2018). "Legal settlement: millions for Jersey City, new home for PATH substation". The Jersey Journal. Retrieved May 27, 2021.
  195. ^ Marion PATH Station Physical Feasibility Study (PDF) (Report). Hatch. January 2020.
  196. ^ Sullivan, Al (2022). "Is a New Path for Public Transit Coming to Jersey City? Station Would Use Previously Constructed Tracks". TapINto. Retrieved August 16, 2023.
  197. ^ Heinis, John (April 8, 2022). "Fulop, Tom DeGise, & Bob Menendez all in favor of Marion Street PATH Station in Jersey City". Hudson County View.
  198. ^ Lenox, Steve (April 24, 2022). "Is a New Path for Public Transit Coming to Jersey City?". TAPinto. Retrieved August 23, 2023.
  199. ^ Fry, Chris (May 10, 2022). "Renderings Revealed for Development on Jersey City's Giles Avenue". Jersey Digs.
  200. ^ a b c d e f g h "PATH Timetable, Map and Guide" (PDF). Port Authority of New York and New Jersey. September 2017. Archived from the original (PDF) on May 8, 2018. Retrieved April 30, 2018.
  201. ^ "2019 PATH Monthly Ridership Report" (PDF). pathnynj.gov. Port Authority of New York and New Jersey. 2019. Archived from the original (PDF) on August 2, 2019. Retrieved October 14, 2019.
  202. ^ a b "The PATH Train Loses $400 Million a Year. Why Keep Spending Billions on It?". The New York Times. January 2, 2019. ISSN 0362-4331. Retrieved January 2, 2019.
  203. ^ "World Trade Center Progress" (PDF). panynj.gov. The Port Authority of New York and New Jersey. February 2010. p. 2. Archived from the original (PDF) on September 24, 2015. Retrieved August 31, 2014.
  204. ^ "PATH Hoboken/World Trade Center Weekend Service Change Effective Sunday, April 9, 2006" (PDF). Port Authority of New York and New Jersey. April 9, 2006. Archived from the original (PDF) on April 10, 2006. Retrieved April 30, 2018.
  205. ^ a b Glucksman, Randy (January 2004). "INCREASED PATH SERVICE" (PDF). New York Division Bulletin. 47 (1). Electric Railroaders Association: 1–2. Archived from the original (PDF) on June 12, 2018. Retrieved May 25, 2017.
  206. ^ Villanova, Patrick (May 4, 2018). "What you need to know about PATH's new weekend closures". NJ.com. Retrieved August 1, 2018.
  207. ^ a b Craig, Philip G. (December 2011). "AN ODE TO PATH'S PA-1S" (PDF). Electric Railroaders' Association Bulletin. 54 (12): 16–18. Archived from the original (PDF) on February 11, 2017. Retrieved April 10, 2018 – via Issuu.
  208. ^ "PATH Ridership Report". Port Authority NY NJ. Port Authority of New York and New Jersey. 2018. Retrieved February 22, 2023.
  209. ^ "The PATH Turns 100". The New York Times. February 26, 2008. ISSN 0362-4331. Retrieved October 30, 2016.
  210. ^ Baer, Christopher T. (April 2015). "A General Chronology of the Pennsylvania Railroad Company Its Predecessors and Successors and Its Historical Context: 1932" (PDF). Pennsylvania Railroad Technical Historical Society. p. 29. Retrieved December 7, 2015.
  211. ^ Burks, Edward C. (July 7, 1971). "New PATH Station Opens Downtown". The New York Times. p. 74. Retrieved May 30, 2010.
  212. ^ Strunsky, Steve (April 21, 2015). "Good and bad news for Harrison PATH riders awaiting new station". NJ Advance Media. Retrieved April 22, 2015.
  213. ^ Strunsky, Steve (April 5, 2012). "Harrison hopes upgraded PATH station will help welcome commuters with a grand new view". The Star Ledger. Newark. Retrieved April 5, 2012.
  214. ^ a b c "Fares – PATH – The Port Authority of NY & NJ". www.panynj.gov. The Port Authority of New York and New Jersey. Archived from the original on March 23, 2022. Retrieved March 25, 2022.
  215. ^ "Fares". panynj.gov. The Port Authority of New York and New Jersey. Archived from the original on August 22, 2008. Retrieved October 27, 2008.
  216. ^ Strunsky, Steve (June 11, 2015). "Should the NYC subway map include N.J.? This man thinks so, and he's not alone". nj.com. New Jersey On-Line. Retrieved April 6, 2017.
  217. ^ a b Higgs, Larry (December 4, 2023). "PATH to start testing tap-and-go fare payments at 2 stations Tuesday". nj. Retrieved December 4, 2023.
  218. ^ a b Brachfeld, Ben (December 4, 2023). "Port Authority unveils new contactless payment system for PATH Train, dubbed 'TAPP'". amNewYork. Retrieved December 4, 2023.
  219. ^ "About TAPP". www.tappandride.com. Retrieved January 18, 2024.
  220. ^ "Hudson Tubes Ask 5-Cent Fare Rise". The New York Times. September 18, 1961. ISSN 0362-4331. Retrieved June 12, 2018.
  221. ^ "Port Agency Plans To Cut Tube Fare To Newark by 10c". The New York Times. November 13, 1966. ISSN 0362-4331. Retrieved June 12, 2018.
  222. ^ "15c PATH Fares On Intrastate Runs Will End on Oct. 19". The New York Times. September 14, 1970. ISSN 0362-4331. Retrieved June 12, 2018.
  223. ^ Peal, Frank J. (November 7, 1971). "PATH Discontinuing Tokens for Cash". The New York Times. ISSN 0362-4331. Retrieved June 12, 2018.
  224. ^ "Annual Report 1990" (PDF). Port Authority of New York and New Jersey. December 31, 1990. p. 33. Archived from the original (PDF) on February 11, 2017. Retrieved June 10, 2018.
  225. ^ a b McGeehan, Patrick (February 21, 2006). "New at PATH Stations: Wave, Don't Swipe". The New York Times. ISSN 0362-4331. Retrieved June 10, 2018.
  226. ^ a b Kennedy, Randy (November 4, 1996). "PATH System Might Link To Metrocard". The New York Times. ISSN 0362-4331. Retrieved June 10, 2018.
  227. ^ Buccino, Anthony R. (October 26, 2008). "Bye-bye PATH QuickCards". NJ.com. Retrieved June 10, 2018.
  228. ^ "Success of SmartLink and use of pay-per-use MetroCards prompts phase-out of PATH QuickCards". Port Authority of New York and New Jersey. January 11, 2009. Archived from the original on January 11, 2009. Retrieved June 27, 2018.{{cite web}}: CS1 maint: unfit URL (link)
  229. ^ a b Higgs, Larry (October 25, 2008). "PATH Phasing Out QuickCard Payment". Asbury Park Press. p. 10. Retrieved June 10, 2018 – via Newspapers.com.
  230. ^ Higgs, Larry (January 6, 2016). "PATH riders who use this card have until Feb. 12 to trade it in". NJ.com. Retrieved June 27, 2018.
  231. ^ Marsico, Ron (July 4, 2007). "Lower Manhattan now offers PATH to a smarter commute". The Star-Ledger. Archived from the original on March 3, 2016. Retrieved July 10, 2007.
  232. ^ "How does Automatic Replenishment work?". Port Authority of New York and New Jersey. Retrieved June 13, 2018.
  233. ^ "MetroCard". panynj.gov. Archived from the original on December 11, 2019. Retrieved June 10, 2018.
  234. ^ Harmon, Amy (August 11, 1997). "What Galls a Hacker Most? The Metrocard". The New York Times. ISSN 0362-4331. Retrieved June 10, 2018.
  235. ^ "PATH Frequently Asked Questions – The Port Authority of NY & NJ". www.panynj.gov. Retrieved June 10, 2018.
  236. ^ "PATH Is Installing High-Tech Fare System". American Public Transportation Association. June 6, 2005. Archived from the original on June 12, 2018. Retrieved June 10, 2018.
  237. ^ "Introducing the TAPP Pilot". Port Authority of New York and New Jersey. Retrieved January 2, 2024.
  238. ^ Flammia, Dino (March 20, 2024). "it's much easier to ride PATH between NJ and NY". New Jersey 101.5. Retrieved March 21, 2024.
  239. ^ Rahhal, Emily; Mocker, Greg (March 20, 2024). "PATH adds tap-and-go payment at World Trade Center station". PIX11. Retrieved March 21, 2024.
  240. ^ "Tap-And-Go Payment System Now Available At All NJ PATH Stations". 102.3 WSUS. May 2, 2024. Retrieved May 13, 2024.
  241. ^ Fazelpoor, Matthew (May 3, 2024). "TAPP payment system rolls out to all NJ PATH stations". NJBIZ. Retrieved May 13, 2024.
  242. ^ "PANYNJ expands tap-and-go fare option to all PATH stations". Mass Transit. May 24, 2024. Retrieved June 6, 2024.
  243. ^ "New York PATH Railway Upgrade". Railway-technology.com. Retrieved June 12, 2018.
  244. ^ "New PATH Train Cars". MyFoxNY.com. July 10, 2009. Archived from the original on February 17, 2012. Retrieved July 10, 2009.
  245. ^ "2008 Budget and Updated 2007-2016 Capital Investment Plan". Port Authority of New York & New Jersey. PATH → Updated 2007–2016 Capital Plan Overview → PATH Cars. Archived from the original on August 14, 2009.
  246. ^ Higgs, Larry (December 6, 2017). "$300M shopping spree rolling down the PATH tracks". NJ.com. Retrieved March 2, 2018.
  247. ^ "Port Authority Board Authorizes Purchase of 50 New Rail Cars for PATH System". Mass Transit. December 8, 2017. Retrieved December 9, 2017.
  248. ^ a b "Kawasaki awarded $240m supply and refurb contract for New York subway fleet". Global Rail News. July 30, 2018. Retrieved August 1, 2018.
  249. ^ Higgs, Larry (September 15, 2022). "Longer trains are coming as the first of 72 new PATH rail cars arrives". nj. Retrieved February 11, 2023.
  250. ^ "PATH, Kawasaki sign for new, refurbished cars". Railway Age. August 1, 2018. Retrieved August 1, 2018.
  251. ^ a b Braun, Martin (August 22, 2014). "PATH Train Less Efficient Than Subways as Cars Cover Loss". Bloomberg.com. Retrieved January 4, 2018.
  252. ^ @PANYNJ (September 14, 2022). "The future of rail travel in our region is here" (Tweet). Retrieved September 14, 2022 – via Twitter.
  253. ^ Dreisbach, Douglas (June 14, 2011). "PATH Integrated Railcar and Signal System Replacement Program – PowerPoint Presentation" (PDF). Archived from the original (PDF) on April 25, 2018. Retrieved June 23, 2014.
  254. ^ a b c d e f "PATH/H&M Complete Roster". Long Island Rail Road Photos, Maps, and History. January 8, 2003. Retrieved June 12, 2018.
  255. ^ a b c In Re Hudson & Manhattan Railroad Company, 138 F. Supp. 195 (S.D.N.Y. 1955).
  256. ^ a b Chiasson, George (August 2015). "Rails Under the Hudson Revisited – The Hudson and Manhattan". Electric Railroaders' Association Bulletin. 58 (8): 7. Retrieved April 10, 2018 – via Issuu.
  257. ^ "Tube Service To Newark: Pennsylvania-Hudson Steel Trains in Operation This Morning". The New York Times. November 26, 1911. ISSN 0362-4331. Retrieved April 11, 2018.
  258. ^ In Re Hudson & Manhattan Railroad Company, 172 F. Supp. 329 (S.D.N.Y. 1959).
  259. ^ a b Williams, Lena (November 27, 1984). "Japanese To Manufacture Transit Cars In Yonkers". The New York Times. ISSN 0362-4331. Retrieved June 12, 2018.
  260. ^ "Japanese firm coming to Otis" (PDF). Yonkers Herald Statesman. December 2, 1984. pp. B3. Retrieved June 15, 2018 – via Fultonhistory.com.
  261. ^ "Collision of Port Authority Trans-Hudson Train with Bumping Post at Hoboken Station, Hoboken, New Jersey, May 8, 2011" (PDF). National Transportation Safety Board. 2012. p. 3. Retrieved June 12, 2018.
  262. ^ "National Museum of Transportation, St. Louis Train Sheds". rgusrail. Retrieved July 18, 2020.
  263. ^ a b Chiasson, George (December 2015). "Rails Under the Hudson Revisited – The Hudson and Manhattan". Electric Railroaders' Association Bulletin. 58 (12): 2–3. Retrieved April 10, 2018 – via Issuu.
  264. ^ "Hudson & Manhattan 503". www.bera.org. Retrieved January 27, 2021.
  265. ^ "Hudson and Manhattan Railroad. Full issue of Electric Railroads, No. 27, Aug. 1959. Published by Electric Railroaders Assn., N.Y., N.Y. - Serial | Hoboken Historical Museum".
  266. ^ "9/11 survivor to Shore Line Museum" (Press release). Shore Line Trolley Museum. November 9, 2015. Archived from the original on November 15, 2015. Retrieved April 6, 2017.
  267. ^ "9/11 surviving PATH Subway Car will arrive at SLTM" (Press release). Shore Line Trolley Museum. July 16, 2015. Archived from the original on November 17, 2016. Retrieved April 6, 2017.
  268. ^ Borrello, Stevie (December 4, 2015). "PATH train cars that survived 9/11 on display in CT, NY trolley museums". WABC-TV. Retrieved April 6, 2017.
  269. ^ "Federal Railroad Administration: Passenger Rail; Chapter 1". Archived from the original on March 20, 2009. Retrieved March 3, 2009.
  270. ^ Vantuono, William C. (October 27, 2009). "Siemens lands PATH CBTC contract". Railway Age. Retrieved June 11, 2018.
  271. ^ "Amtrak's Northeast Corridor: Information on the Status and Cost of Needed Improvements". U.S. Government Publishing Office. April 13, 1995. Retrieved June 11, 2018.
  272. ^ "The Port Authority of New York and New Jersey – PATH". March 29, 2006. Archived from the original on March 29, 2006. Retrieved April 6, 2017.
  273. ^ "PATH Rapid-Transit System". Archived from the original on September 28, 2007. Retrieved October 27, 2008.
  274. ^ "PATH Community – PATH – The Port Authority of NY & NJ". www.panynj.gov (Press release). The Port Authority of New York and New Jersey. Archived from the original on May 18, 2023. Retrieved August 10, 2023.
  275. ^ "PATH Launches Live Performance Series At Five New Jersey Stations, Starting This Thursday At Harrison Station". www.panynj.gov. The Port Authority of New York and New Jersey. Retrieved August 11, 2023.
  276. ^ a b "PATH Rules & Regulations" (PDF). Port Authority of New York and New Jersey. December 20, 2015. Archived from the original (PDF) on April 16, 2016. Retrieved March 27, 2021.
  277. ^ a b "Is it really illegal to take pictures in the train station? Transit agencies have differing policies for photographers videographers". Hudson Reporter. December 23, 2014. Retrieved March 2, 2018.
  278. ^ Krages, Bert (November 1, 2006). "Legal Handbook for Photographers: The Rights and Liabilities of Making Images". Amherst Media, Inc. Retrieved April 6, 2017 – via Amazon.
  279. ^ Jacobs, Karrie (July 2006). "The Ad at the End of the Tunnel". Metropolis. ISSN 0279-4977. Archived from the original on July 15, 2006.
  280. ^ Danzig, David (December 20, 2001). "Holiday tree decorates PATH tunnel". The Jersey Journal.
  281. ^ Kaufman, Gil (October 13, 2003). "The Story Behind The White Stripes' 'Hardest Button': Lens Recap". MTV.com. Archived from the original on October 16, 2003. Retrieved October 2, 2013.
  282. ^ "'Law & Order: SVU' Premiere Filmed At Oculus" (PDF). PA News. 16 (16). Port Authority of New York and New Jersey: 1. August 8, 2017. Archived from the original (PDF) on June 13, 2018. Retrieved June 12, 2018.
  283. ^ Bindelglass, Evan (September 20, 2017). "20 best NYC subway cameos in movies and TV". Curbed NY. Retrieved June 13, 2018.
  284. ^ "'John Wick: Chapter 2' Rides a PATH Train of Violence Into Action Movie History". Observer. February 10, 2017. Retrieved January 18, 2020.
  285. ^ "Tube Trains Crash In Fog; 50 Are Hurt". The New York Times. September 1, 1922. ISSN 0362-4331. Retrieved June 12, 2018.
  286. ^ "1 Killed, 15 Injured In Tube Train Crash". The New York Times. July 12, 1923. ISSN 0362-4331. Retrieved June 12, 2018.
  287. ^ "Hudson Tube Crash At 33d St. Hurts 19;". The New York Times. January 17, 1931. ISSN 0362-4331. Retrieved June 12, 2018.
  288. ^ "21 Hurt in Accident in Hudson Terminal; Car Jumps Tracks and Crashes Into Wall". The New York Times. August 23, 1937. ISSN 0362-4331. Retrieved June 12, 2018.
  289. ^ "22 Hurt In Jersey In Tube Line Crash;". The New York Times. November 27, 1938. ISSN 0362-4331. Retrieved June 12, 2018.
  290. ^ "Charge In Crash Upheld". The New York Times. April 29, 1942. ISSN 0362-4331. Retrieved June 12, 2018.
  291. ^ "Wreck Inquiry In Jersey Today". The New York Times. December 19, 1945. ISSN 0362-4331. Retrieved June 12, 2018.
  292. ^ "H.&M. Crash Hurts 30". The New York Times. December 15, 1958. ISSN 0362-4331. Retrieved June 12, 2018.
  293. ^ "26 Hurt in Crash of 2 Tubes Trains; One Rams Into Back End of Second in Hudson Station --3 Persons in Hospital". The New York Times. October 16, 1962. ISSN 0362-4331. Retrieved October 2, 2020.
  294. ^ "5 Inquiries Opened in Jersey In Tube-Train Crash Killing 2; None of Crew Hurt". The New York Times. July 25, 1963. ISSN 0362-4331. Retrieved June 12, 2018.
  295. ^ "Newark Advocate Newspaper Archives, Jul 24, 1963". newspaperarchive.com. July 24, 1963. Retrieved June 17, 2019.
  296. ^ "100 Injured as PATH Train Smashes Into a Second in Jersey City". The New York Times. January 12, 1968. ISSN 0362-4331. Retrieved June 12, 2018.
  297. ^ Sulzberger, A.G. (October 21, 2009). "13 Injured in PATH Train Crash Near Herald Square". The New York Times. ISSN 0362-4331. Retrieved July 17, 2019.
  298. ^ Cowan, Alison Leigh; Secret, Mosi (May 8, 2011). "Dozens Injured as Train Crashes in New Jersey". The New York Times. ISSN 0362-4331. Retrieved May 8, 2011.
  299. ^ Matarese, Jennifer; Hosea, Dan (May 8, 2011). "PATH train crashes into platform at Hoboken Terminal". WABC. Archived from the original on May 10, 2011. Retrieved May 8, 2011.
  300. ^ "Collision of Port Authority Trans-Hudson Train with Bumping Post at Hoboken Station (RAR1205)" (PDF). ntsb.gov. National Transportation Safety Board. November 5, 2012. Retrieved January 5, 2024.
  301. ^ "Hoboken Train Crash Kills 1 and Injures Over 100". The New York Times. September 30, 2016. ISSN 0362-4331. Retrieved June 12, 2018.
  302. ^ "Minor derailment at Newark Penn Station causes delays on PATH trains". ABC7 New York. October 11, 2019. Retrieved October 14, 2019.
  303. ^ Sheldon, Chris (October 10, 2019). "PATH train derails in Newark, delays expected during evening commute". nj. Retrieved October 14, 2019.
  304. ^ Associated Press (June 4, 1982). "28 hurt battling PATH fire" (PDF). Nyack Journal News. pp. A4. Retrieved June 15, 2018 – via Fultonhistory.com.
  305. ^ Narvaez, Alfonso A. (August 9, 1983). "CEILING CRASHES AT PATH CENTER, KILLING 2 AND INJURING 8 IN JERSEY". The New York Times. ISSN 0362-4331. Retrieved June 12, 2018.
  306. ^ Associated Press (August 9, 1983). "Probe begins in PATH disaster" (PDF). Yonkers Herald Statesman. p. 6. Retrieved June 15, 2018 – via Fultonhistory.com.
  307. ^ Narvaez, Alfonso A. (June 20, 1984). "CEILING COLLAPSE LINKED TO FAULTS FOUND IN DESIGN". The New York Times. ISSN 0362-4331. Retrieved July 17, 2019.
  308. ^ Schippert, Steve (July 7, 2006). "ThreatsWatch.Org: InBrief: Foreign Plot to Bomb Holland Tunnel Thwarted – Updated". threatswatch.org. Archived from the original on August 12, 2021. Retrieved December 29, 2017.
  309. ^ Henry, Samantha (January 7, 2013). "5 injured in escalator accident at NJ rail station". AP NEWS. Retrieved July 17, 2019.
  310. ^ Cawthon, Erinn (January 7, 2013). "Escalator's sudden reverse injures 5 at commuter train station". CNN. Retrieved July 17, 2019.

Bibliography

[edit]
  • Brennan, Joseph. "Abandoned stations".
  • Carleton, Paul (1990). The Hudson & Manhattan Railroad Revisited. D. Carleton Railbooks.
[edit]
KML is from Wikidata